OPERATION PROCEDURE
8. Removing the vane motor
(1) Remove the front panel. (Refer to procedure 2)
(2) Remove the screw of the electrical parts box cover, and
remove the cover.
(3) Remove the 2 screws of the vane motor. (See Photo 10)
Disconnect the relay connector and remove the motor
from the shaft.
(4) Disconnect the vane motor connector (CN5V) on the
indoor controller board.
9. Removing the pipe temperature detection thermistor/liq-
uid and the pipe temperature detection thermistor/gas
(1) Remove the front panel. (Refer to procedure 2)
(2) Remove the electrical box cover. (See Photo 2)
(3) Remove the water cut. (See Photo 3)
(4) Cut the wiring fixed band.
(5) Remove the pipe temperature detection thermistor/liquid
(TH22) and the pipe temperature detection thermistor/gas
(TH23).
(See Photo 11)
(6) Disconnect the connector (CN29) (CN21) on the indoor
controller board.
HEAD OFFICE : TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU TOKYO 100-8310, JAPAN
cCopyright 2007 MITSUBISHI ELECTRIC CORPORATION
Issued: Mar. 2017 No. OCH418 REVISED EDITION-E
Issued: Jul. 2016 No. OCH418 REVISED EDITION-D
Issued: Dec. 2012 No. OCH418 REVISED EDITION-C
Issued: Nov. 2011 No. OCH418 REVISED EDITION-B
Issued: Nov. 2008 No. OCH418 REVISED EDITION-A PDF 7
Published: May 2007 No. OCH418 PDF 9
Made in Japan
PHOTOS
Photo 10
Heat exchanger
Vane motor
Photo 11
Heat exchanger
Pipe temperature
detection thermistor/
liquid (TH22)
Pipe temperature
detection thermistor/
gas (TH23)
Specifications are subject to change without notice.
32
Vane motor fixing
screws
Nozzle assembly
Electrical box