CALI alumLEDs ALS500T-SWM-FG Installation Instructions Manual page 9

Advertisement

10
Mount luminaire to Rail Brackets by sliding luminaire with assembled Hanging
Bracket Arms into Rail Brackets. Ensure each Hanging Bracket rests at the
center of each Rail Bracket.
Slide luminaire with Hanging
Bracket Arms onto Rail Bracket
11
Secure connections between continuous runs using Connector Blocks after all
luminaires have been mounted.
Note: Refer to steps on page 17 for details.
12
Install Ceiling Trim after all runs have been mounted and connected.
Note: Follow the steps on page 18 to install Ceiling Trim.
13
After all luminaires are mounted, adjust height and levelness of each luminaire
by tightening or loosening hex nuts on Hanging Bracket assembly.
Allow the weight of the luminaire to be suspended by the Hanging Bracket while
simultaneously resting on the flange of the T-Bar.
Note: One person holds the luminaire and another person adjusts hex nuts.
Tighten hex
nuts as needed
CALIFORNIA ACCENT LIGHTING, INC.
2820 E. Gretta Lane, Anaheim, CA 92806
ph. 800.921.CALI (2254) | fx. 714.535.7902 | info@calilighting.com | calilighting.com
© CALI. All rights reserved. CALI reserves the right to make changes or withdraw specifications without prior notice.
Ceiling Trim resting on T-Bar
ALS500T-SWM-FG
Mounting (Hanging Bracket Assembly ) 2 of 2
14
Secure a tie wire to each Hanging Bracket Arm after luminaires are set in place.
Note: Refer to the diagrams on page 7 for details.
15
Drivers may be mounted on top of luminaire if suitable for your application.
Only mount drivers on top of luminaire if it is readily accessible, such as a
dropped tile ceiling. Position the driver in the center of luminaire and secure
using 1/4" #8 screws (by others). Do not mount drivers between segments.
Note: Driver size and location of mounting holes may differ from below example.
16
Make wiring connections from driver to 1st PCB. Pull lead wires from luminaire
and make splice connections to lead wires from driver. Verify wiring diagram
before connecting.
17
Perform a continuity test before connecting luminaire to power source.
Refer to page 20 for continuity test step by step.
18
Verify driver wire colors from wiring diagram, then connect luminaires to power
source. Drivers used for this product vary. Always confirm wiring diagram from
driver installation instructions before connecting.
19
Apply mud to Wall Trim until completely covered and smooth. Allow to dry
completely before painting or sanding. Do not use pre-mixed mud compounds.
20
After all installation steps are complete and lighting is confirmed to be working,
install reflective film to runs.
Note: Follow the steps on page 19 to install reflective film.
INSTALLATION INSTRUCTIONS
Lead Wire
4 / 2 / 2022 / Rev 4
Page 9 of 20