Install The Hood (Ez1 Bracket) - Broan Alta ALT3 Series Installation Use And Care Manual

Table of Contents

Advertisement

Available languages

Available languages

N
1 ] Run house power cable between service panel and hood location.
2 ] There are 2 pairs of recessed holes on each side of the top of the hood (on rear: A and B,
HORIZONTAL EXHAUST INSTALLATION ONLY
3 ] Temporarily hang the hood on the brackets using its (2) recessed REAR HOLES (A and B).
4 ] Unhook the rear holes from the brackets and hang the hood using its (2) recessed FRONT
VERTICAL EXHAUST INSTALLATION AND NON-DUCTED INSTALLATION ONLY
5 ] Hang the hood on the brackets using the (2) recessed FRONT HOLES (C and D). While
6 ] Connect ductwork to hood and use metal foil duct tape to make joints secure and air-tight.
NOTE: See final installation steps on next page.
16

Install the Hood (EZ1 Bracket)

OTE:
The following procedure applies to both frame or frameless cabinet installations.
on front C and D on illustration below); these holes allow the range hood to hang on the
brackets (previously installed).
While holding the hood, run the house power cable into the hood through the strain relief
previously installed in step 6 on page 11.
HOLES (C and D). While holding the hood, go to step 6.
holding the hood, tighten an appropriate strain relief, 1/2" diameter (not included) to the
power cable, then insert the strain relief in the knockout hole.
Make sure the damper assembly (or round duct plate) enters the ductwork and that the
damper opens and closes freely.
A
C
A
DUCTED INSTALLATION ONLY
D
B
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alta alt330ssAlta alt336ss

Table of Contents