Bradford White UCG100H270 Installation And Operation Manual page 22

Gas-fired commercial water heater
Hide thumbs Also See for UCG100H270:
Table of Contents

Advertisement

Connect the system supply and return piping to the water heater.
Refer to Figure 7 and Figure 8 for installation examples. Maintain a minimum 1/2" clearance from hot water piping to
combustible materials.
Figure 7. Alternate Space Heating Connections.
Figure 8. Typical Plumbing Schematic for Zoned Heating.
22

Advertisement

Table of Contents
loading

Table of Contents