C o nte n t s 、 Safety Precautions Symbol s 、 Symbols and Definition s 、 Accessories and Spare Parts List 、 Installation 1)、 pecifications 2)、Duty ycle and verheating 3)、 achine nstallation 4)、 electing a ocation 5)、 onnecting nput ower 5、...
Safety Precautions Symbols Protect yourself and others from injury, read and follow these precautions before installation and operation. Electric shock can kill: 1、Do not touch live electrical parts。 Re ad in st ru ct io ns . 2、Wear dry,hole-free insulating gloves and 1、Re ad ow ne r' s Ma nua l be fo re using or servicing body protection.
Symbols and Definitions D e f i n ition s Rated maximum 1max supply current Amperes Percent Ma xi mu m ef f e c t i v e 1eff Volts su pp l y cu r r e n t Increase P r o t e c t i v e ea r t h Rated welding...
Accessories And Spare parts A c cesso r i e s an d Spare Parts L ist Pull hammer Vertical sp o t we l d i n g Pn e uma t ic v a c uum c u p ule NO.F002 pull ha m m e r NO .
Installation 1、specifications Model FY-6G Parameters 220V Input voltage 1ph/50/60Hz AC6V-10V Carbon rod heating AC1V-12V Washer fusion Output voltage AC1V-13V Butt weld 19KW Input power 5000A Instant max current Input current Stepless Current Regulation 0-99ms Time regulation system One-side welding thickness...
2、D u ty C yc le a nd Overheating D ut y c ycle i s percentage of 10 minutes tha t u n i t c a n w el d a t r at e d l o ad w ithout overheating. Th e w elder i s e qui pp ed with over-h e rt pr o te c t io n .On exceeding the c r it ical t emp er atu re ,the welder will b e s to p p ed au t om a ti c l ly .The w e ld er can b e us ed again after cooling down.
3、Ma chi ne I nstallation 1) Op en t h e p a ckage a nd f ind out the owner's m a nu al。 2 ) Che ck t he s upplied a ccessor ies a ccording to packing list t h at a ttach ed to t his m anual.
Page 9
4、S el ecting a L ocation 1) Se lect a c orrect l ocation t o p lace the unit 2)D et ermine i nput p ower c ord l e ng th a ccording to its actual o p era tion r equirement . Make s u re t hat the supply cable is a t l ea st 6 mm in diameter 3 )Do n ot m ove o r o perate u nit where it could tip.
Page 10
5、C onn ect ing I nput Power 1、Input power cord(n ot less t han 6mm copper co rd). 2、Over-current p rotection. 3、Disconnect dev ice line terminals. 4、Ground wire L1/L2 input c onductors. Installation must meet all National and Local Codes---have only qualified persons make this installation.
O p e rati o n 1、Co ntr ols 1. Time display 2. Power display 3. Time decrease 4. Time increase 5. Power decrease 6. Power increase 7. Power indicator 8. Overheat indicator 9. Gun working indicator 10. Manual mode indicator 11.
2、We ld ing G un a nd A daptors 1、Electrode ho l der 2、Trigger Sin g l e - S i d e d appl i c a t i o n s Carbo Rod Shrinking OT Washer Welding Washer Welding Stud Welding Single-sided Welding Wave form Wire Welding...
3、Op era ti on 、 a、spot welding F008+F020 Set correct pow er Connect negative outside wire Connect spot welding to a clean,paint-free location ( P o s i t i o n C i s r e c o m m e n d ) . electrode tip with welding on metal workpiece,as close to gun and tighten.
3、Op era ti on b、Washer Welding Set correct pow er F017+F011+F020 Connect negative outside wire ( P o s i t i o n A o r B i s r e c o m m e n d ) . Connect washer adaptor with to a clean,paint-free location welding gun and tighten,...
3、Operation c、Triangle Washer Welding Set correct pow er F003+F020 Connect negative outside wire ( P o s i t i o n A i s r e c o m m e n d ) . to a clean,paint-free location Connect triangel washer pull hammer with welding gun.
3、Operation d、Carbon rod Heating Connect negative outside wire Set c orrect power F007+F009+F020 to a clean,paint-free location Connect carbon rod and on metal workpiece,as close to carbon rod adaptor with ( P o s i t i o n A i s r e c o m m e n d ) . welding area as possible.
3、Operation e、 Wave Form Wire Welding F006+F010+020 Set c orre ct power Connect negative outside wire to a clean,paint-free location Connect wave form wire electrode ( P o s i t i o n A i s r e c o m m e n d ) . on metal workpiece,as close to tip with welding gun.
3、Operation f、Cupules Manual operating cupule: 1、 onnect manual cupule with pull hammer. 2、 sh ma nua l c upu le in to loc k the cupule on the dent. 3、Slide the hammer to opposite direction to pull the dent out. Pneumatic vacuum cupule: 1、Connect gas/air supply with the adaptor...
Maintenance 1、E x pl o ded v iew Voltmeter Current adjustment switch Main transformer A.C.contactor Contiol transformer L e f t s ide vi e w Control circuit board Main transformer Right si d e v iew P a g e . 1 7...
Page 20
Ma i nt e na n ce 2、Troubleshooting Trouble Reason Remedy (1)Connect power supply according (1)Connected power supply to manufacturer’s instructions. No welding output incorrectly. (2) lace power switch in “on” (2)Power switch in "off" position. position (1)Replace trigger. (1)Trigger damaged. (2)Connect again or replace if nec- (2)Gun control wire broken.
Need help?
Do you have a question about the FY-6G and is the answer not in the manual?
Questions and answers