Daikin Altherma 3 R W Installer's Reference Manual page 134

Hide thumbs Also See for Altherma 3 R W:
Table of Contents

Advertisement

9
|
Electrical installation
Installer reference guide
134
K1A, K2A Relays
X10M Terminal block
a Screws for X10M
b Screws for K1A and K2A
c Sticker to put on the high voltage wires
d Wires between the relays and X5M (AWG22 ORG)
e Wires between the relays and X10M (AWG18 RED)
C
2 Connect the low voltage wiring as follows:
A
B
C
S4S Smart Grid pulse meter
B
3 Connect the high voltage wiring as follows:
C
b
K1A K2A
A
X5M.4
X5M.3
C
b
1 2 3 4
a
X10M
S4S
ERGA04~08E + EHBH/X04+08E
Daikin Altherma 3 R W
4P629085-1C – 2022.05

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents