Advertisement

Quick Links

SRG
User Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SRG and is the answer not in the manual?

Questions and answers

Summary of Contents for HyQuest Solutions SRG

  • Page 1 User Manual...
  • Page 2: Table Of Contents

    Table of Contents Disclaimer Scope of Delivery Safety Instructions Introduction Part I Installation Part II Unpacking your SRG Raingauge ........................7 Choosing the Site ............................. 8 Placing the Gauge ............................8 Operation Part III Maintenance Part IV Repair Part V...
  • Page 3: I Disclaimer

    HyQuest Solutions or KISTERS AG. Other product documentation and the information contained in it, names used may or may not be the trademarks of even if HyQuest Solutions has been advised of the their respective owners. possibility of such damages.
  • Page 4: Scope Of Delivery

    Scope of Delivery § 1 × catch #SRG01 § 1 × collector #SRG02-01 § 1 × outer enclosure #SRG03 § 1 × rain measure #SC085-01 © 2022 HyQuest Solutions © 2022 HyQuest Solutions...
  • Page 5: Safety Instructions

    Before starting to work, you have to check the functioning and integrity of the system. § Check for visible defects on the SRG, this may or may not include any or all of the following mounting facilities, connectors and connections, mechanical parts, internal or external communication devices, power supplies or power supply lines, etc.
  • Page 6: Part I Introduction

    The HyQuest Solutions Standard Rain Gauge model SRG is recognised as the standard for non recording type rain gauges. The SRG is fully constructed from aluminium except for the rain measure which is made from durable plastic and has a capacity of 20 mm of rainfall.
  • Page 7: Part Ii Installation

    Placing the Gauge Unpacking your SRG Raingauge Please verify that you have received the items listed in the Scope of Delivery. To prepare the SRG for installation: § Lift the unit from the carton and place on secure surface. §...
  • Page 8: Choosing The Site

    Position the rain measure centrally in the collector. Place the catch onto the collector. The immediate area around the gauge should be such that it does not promote splashing into the gauge (grass or mulch). The gauge is now ready for operation. © 2022 HyQuest Solutions...
  • Page 9: Part Iii Operation

    In the event of heavy rainfall where greater than 20mm of rain has fallen, the rain measure will overflow into the collector. To measure this large amount of rainfall it is simply a matter of pouring from the collector into the rain measure and totalling the amounts. © 2022 HyQuest Solutions...
  • Page 10: Part Iv Maintenance

    Periodically the following maintenance should be carried out: § Remove leaves or other material from the catch § Around the gauge from overhanging grass etc. § Clean the rain measure and collector § Inspect the gauge for damage, in particular the catch rim © 2022 HyQuest Solutions...
  • Page 11: Part V Repair

    In rare cases, a product may not be delivered in accordance with your order. In such cases HyQuest Solutions’ return and repair policy applies. For you as a customer, this means the following: 1. Contact HyQuest Solutions using the Repair Request Form made available online: https://www.hyquestsolutions.eu/fileadmin/Form/Telemetry_Solution_app.jpg.pdf...
  • Page 12: Part Vi Obligations Of The Operator And Disposal

    Instead, these old appliances must be collected separately and disposed of via the local collection and return systems. Integrated or provided batteries and accumulators must be separated from the appliances and disposed of at the designated collection point. © 2022 HyQuest Solutions...
  • Page 13 Obligations of the Operator and Disposal EU WEEE Directive As players in the environmental market, KISTERS AG and HyQuest Solutions are committed to supporting efforts to avoid and recycle waste. Please consider: Avoidance before recycling! Recycling before disposal! This symbol indicates that the scrapping of the unit must be carried out in accordance with Directive 2012/19/EU.
  • Page 14: Part Vii Appendices

    Appendices Appendices This chapter contains the following subsection: § Chart Chart Date Date © 2022 HyQuest Solutions...
  • Page 15 Appendices Totals No. of Days Totals Since Mont Mont Mont Mont Month Month Month Month Month Month Year Jan 1 Avera Year © 2022 HyQuest Solutions...
  • Page 16 Contact Data Europe | HyQuest Solutions (KISTERS AG) +49 2408 9385 0 info@hyquestsolutions.eu Australia | HyQuest Solutions Pty Ltd +612 9601 2022 sales@hyquestsolutions.com.au New Zealand | HyQuest Solutions NZ Ltd +64 7 857 0810 sales@hyquestsolutions.co.nz Latin America | HyQuest Solutions (KISTERS LATAM) +57 350 575 4079 sales-latam@hyquestsolutions.com...
  • Page 17 © 2022 HyQuest Solutions 21/04/2022...

Table of Contents