Page 3
Connect the MGL HP delivery system to GentleLASE laser. Install cryogen canister into the laser per the procedure in the Operator’s Manual. Turn on the GentleLASE laser. System should display a warm-up message. Warm- up takes approximately 20 minutes. The DCD unit must complete warm-up prior to the following tests! The cryogen is fully warmed up when the canister pressure on the maintenance screen is between 118 and 122 PSI.
Page 4
Toggle the BBL Ckt Test off. Verify the voltage on the CPU I/O PCB at TP29 (+) and TP31 (-) returns to 7.75 VDC ± 0.5 VDC. Reinstall cryogen line to the front panel bulkhead connector. Page 4 of 5 Candela Corporation Proprietary 8503-01-0830, Revision A...
Page 5
Candela Corporation MGentleLASE Bubble Circuit Calibration Procedure 8503-01-0830, Revision A Candela Corporation Proprietary Page 5 of 5...
Need help?
Do you have a question about the GentleLASE and is the answer not in the manual?
Questions and answers