Chapter 2 Getting Started; Packaging, Shipment And Delivery; Unpacking Gv-Storage System V3 (Rev. B) - GeoVision GV-Storage System V3 Hardware User Manual

Table of Contents

Advertisement

Chapter 2

2.1 Packaging, Shipment and Delivery

 Before removing GV-Storage System V3 (Rev. B) from the shipping carton, you should
visually inspect the physical condition of the shipping carton.
 Unpack GV-Storage System V3 (Rev. B) and verify that the contents of the shipping carton
are all there and in good condition.
 Exterior damage to the shipping carton may indicate that the contents of the carton are
damaged.
 If any damage is found, do not remove the components; contact the dealer where you
purchased GV-Storage System V3 (Rev. B) for further instructions.

2.2 Unpacking GV-Storage System V3 (Rev. B)

The package contains the following items:
GV-Storage System V3 (Rev. B)
Unit
Two (2) power cords
Six (6) Ethernet LAN cables
(For 1 Gigabit Ethernet Ports
only)
One (1) RS232 null modem
cable (For UPS, phone jack to
DB9)
Screws (packet)
PSFM Blanking Plate
Rail Kit
Download Guide
If any of these items are missing or damaged, please contact your dealer or sales
representative for assistance.
10
Getting Started

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GV-Storage System V3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents