7.2.1 FIRST STARTING CHECK-UP / COMMISSIONING REPORT
- After the unit is switched on, the motors start an initialization, after a few seconds of the initialization the control
input is active. The unit can be switched on via the control input. Do the commissioning tests at maximum
speed, as soon as the commissioning tests are done switch off the unit via the control input.
- The unit / motor serial number, rpm, mounting power, voltage and current.
- Do a visual inspection on the unit / motor; - cleanliness; - terminal box/service switch; - leads cables;
- cable glands; - bolts; - fittings
- The type of start; DOL, soft starter, frequency inverter, etc...
- The voltage between phases and compare with the voltage on the nameplate the unit.
- The current in each phase and compare with current on the nameplate of the unit.
- The speed of the unit and compare it with the speed on the nameplate of the unit.
- The bearing temperature.
- The vibration of the unit / motor and the acceleration.
- Final condition → approved or not approved and who is responsible for the approving.
If some / one of above-mentioned variables does not meet standard specification(s) or
are out of supplier characteristics and recommendations, please inform the supplier
immediately and SWITCH OFF THE UNIT / MOTOR to avoid serious damage of unit. If this
information is not communicated with the supplier immediately the warranty terms may
be void.