Buffalo DC319-P Assembly, Installation And Operation Instructions page 22

Table of Contents

Advertisement

Commissioning
Before leaving the converted installation;
1.
Check all gas connections for leakages.
2.
Check the following functions in accordance with the operating instructions
Light the Pilot Burner.
Light the Main Burner..
Ensure that all the controls operate correctly.
Ensure that the operating pressure remains correc
3.
Ensure any adjustments done to components that have the adjustments / settings sealed
(e.g. paint sealed) are re-sealed.
DO NOT USE A NAKED FLAME TO CHECK FOR GAS LEAKAGES.
NOTE: If for some reason it is not possible to get the appliance to operate correctly, shut off the
gas supply and contact the supplier of this appliance.
WARING:
22
t.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dc319-n

Table of Contents