Introduction
This document describes the routine maintenance of the Hallett 1000 and is
supplemental to the Instruction Manual GH44. The Instruction Manual should be
thoroughly read first as it contains important safety information. The Hallett 1000 should
be installed in compliance with all applicable federal, state/provincial, and local
regulations. The maintenance is divided into weekly, monthly, and annual activities and
can be modified if the unit is operating on a seasonal basis.
Contents
Introduction .................................................................................................................................................. 1
Weekly Activities ........................................................................................................................................... 1
First Week ................................................................................................................................................. 1
Weekly ...................................................................................................................................................... 2
Monthly Activities ......................................................................................................................................... 2
First Month ............................................................................................................................................... 2
Every 4 Months ......................................................................................................................................... 3
Every 16 Months ....................................................................................................................................... 3
Annual Activities ........................................................................................................................................... 4
Every year.................................................................................................................................................. 4
Every 5 years ............................................................................................................................................. 4
Log Sheets ..................................................................................................................................................... 4
Weekly Activities
Some Hallett 1000 installations may be fully monitored with data logging capabilities
and telemetry for operator notification. For sites with no central controller, monitoring the
performance of the system can be combined with maintenance activities.
First Week
-After commissioning a new system, it is advisable to perform the following
tasks:
• Inspect piping for leaks particularly piping overhead of the Hallett.
14-Feb-22
Maintenance of the Hallett 1000
1 of 10
GH98A