ZEAPON PS-E1 User Manual page 5

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3
Function Introduction
Function
Power on
Power off
Left Rotation
Right Rotation
Speed Adjustment
Create the point
Delete all points
Start operation
Starts/Pauses circulation
Automatic left and
right/moving
Note:
The vertical load of pan head is
The horizontal load is
1. Take out the rail slider connecting seat from the bottom of the pan head
2. Install the pan head on the tripod
3. Install the ball head on the pan head
4. Install the quick-mount plate to the bottom of the device
5. Install the device installed with the quick-mount plate on the pan head.
Button Action
Press and hold the power
button for 3 s
Press and hold the power
button for 3 s
Press and hold the left button
Press and hold the right
button
Click the power button once
Double click the power
button twice
Press and hold the left button
+ the right button
Double click the power
button twice
Click the left/right button +
the power button
Double-click left/right buttons
4kg;
50 kg;
5
Beep
/
/
/
/
/
Creation point 1 ring once
Creation point 2 rings twice
Rings long once
/
Rings once
/

Advertisement

Table of Contents
loading

Table of Contents