Seasonal Shutdown Instructions - SPX Cooling Technologies Marley MH 05-116E User Manual

Fluid cooler
Table of Contents

Advertisement

Figure 4
Caution
28
Maintenance
Motor
Grease Fill Plug
Grease Relief Plug
3. Insert grease fittings in grease fill openings and add grease until grease
is forced out through relief openings.
4. Replace fill plugs and operate mechanical equipment 30 minutes to
one hour to purge excess grease at grease relief opening.
5. Reinstall grease relief plugs and reinstall guard.
6. Resume normal fluid cooler operation.

Seasonal Shutdown instructions

When the system is to be shut down for an extended period of time, it is
recommended that the recirculation water system be drained. Leave the
basin drains open.
Draining the coil is not recommended—draining promotes corro-
sion inside the coil tubes. See protecting coil in Freezing weather
on page 18.
During shutdown, clean the fluid cooler (see Warning, page 21) and make
any necessary repairs. Eliminators and louvers are easily removed to gain
access to the coil. Pay particular attention to mechanical equipment sup-
ports and sheaves or coupling (or drive shafts).
Following each year's shutdown and cleaning, inspect the fluid cooler's
metal surfaces for evidence of the need to apply a protective coating. Do
not misinterpret grime as a need to have the tower painted. If relatively
bright metal can be exposed by cleaning, consider that the galvanizing
Steel Side Casing
Attachment Screw
Guard

Advertisement

Table of Contents
loading

Table of Contents