This installation guide is applicable to SkyEdge II-c Capricorn S2X Outdoor CPEs with an internal
power adapter.
To install the SkyEdge II-c CPE, the installer must:
•
Be trained in the installation of the SkyEdge II-c Capricorn S2X Outdoor CPE
•
Have the CPE configuration parameters available
Unpacking Guidelines
1. Unpack the unit and its accessories.
2. Compare with the supplied BOM and verify that nothing is missing.
3. Verify that nothing is damaged.
Marking explanation:
G
ROUNDING MARK
Capricorn Outdoor CPE General Information
VSAT AC and DC power supplies are provided by Gilat. If the power to the VSAT is
not through an AC or DC adaptor (e.g., batteries, solar panels, rectifier ETC), the
power solution must be approved by the Gilat Technical Support
•
Before installing the unit, verify that the antenna and DC power cord are
grounded to provide protection against voltage surges and static charges.
•
Please note that the output to the BUC can be either 24v or 48v, depending on
the model.
•
Section 810 of the US National Electrical Code, ANSI/NFPA 70, and Section
54 of the Canadian Electrical Code provide information with regard to proper
grounding of the mast and supporting structure, grounding of the lead-in wire
to an antenna discharge unit, size of grounding conductors, location of
antenna discharge unit, connection to grounding electrodes and requirements
for the grounding electrode.
The Capricorn Outdoor CPE contains 4 LAN ports and uses a DC input of 48V.
DCP0000272(E)
Capricorn S2X Outdoor CPE Installation Guide
.
Figure 1: Front Panel
Figure 2: Rear Panel
Proprietary to Gilat Satellites Networks Ltd.
Warning
.
1
Need help?
Do you have a question about the SkyEdge II-c Capricorn S2X and is the answer not in the manual?
Questions and answers