This installation note is applicable for SkyEdge II-c Gemini/Capricorn and Gemini S2X CPE
with an external power adapter.
To install the SkyEdge II-c CPE, the installer must:
Complete Gilat VSAT Installer course
Be familiar with the SkyEdge II-c CPE Installation Manual (DC-103322-X)
Have the CPE configuration parameters available
VSAT AC and DC power supplies are provided by Gilat. If the power to the
VSAT is not through an AC or DC adaptor (e.g., batteries, solar panels,
rectifier ETC), the power solution must be approved by the Gilat Technical
Support.
T
CPE
HE
OF THE GROUNDING CABLE TO THE GROUNDING STUD ON THE REAR OF THE
AND THE OTHER END TO THE SITE MAIN GROUND CONNECTION
GROUNDING CABLE SHOULD BE USED
T
CPE
HE
T
HE POWER CABLE MUST BE DISCONNECTED FROM THE
CONNECTING THE
I
N ORDER TO PREVENT DAMAGE TO THE
A PERMANENT
(10-25
CM
IN

General Precautions

Do not block the ventilation openings of the CPE.
Do not place the CPE in a location that would deviate from typical ambient
environmental conditions of temperature, humidity and moisture.
Do not place any object on top of the CPE.
B
EFORE INSTALLING THE UNIT
GROUNDED SO AS TO PROVIDE PROTECTION AGAINST VOLTAGE SURGES AND STATIC
.
CHARGES
S
810
ECTION
S
54
ECTION
REGARD TO PROPER GROUNDING OF THE MAST AND SUPPORTING STRUCTURE
GROUNDING OF THE LEAD
GROUNDING CONDUCTORS
GROUNDING ELECTRODES AND REQUIREMENTS FOR THE GROUNDING ELECTRODE
1

CPE Installation Note

MUST BE GROUNDED PRIOR TO INSTALLATION BY ATTACHING ONE END
MUST BE CONFIGURED PRIOR TO ATTACHING THE
RF
.
CABLES
,
STATIC OBJECT SUCH AS A TABLE OR PIPE
.)
CPE,
FROM THE
PRIOR TO CONNECTION

Warning

,
VERIFY THAT THE ANTENNA AND
US N
E
OF THE
ATIONAL
C
E
OF THE
ANADIAN
LECTRICAL
-
IN WIRE TO AN ANTENNA DISCHARGE UNIT
,
LOCATION OF ANTENNA DISCHARGE UNIT
C
AUTION
.
C
AUTION
RF C
,
ONNECTORS
,
AT A DISTANCE OF
.
C
, ANSI/NFPA 70,
LECTRICAL
ODE
C
ODE PROVIDE INFORMATION WITH
CPE,
. 18AWG
RF
.
CABLES
CPE
PRIOR TO
SECURE THE CABLES TO
25-60
AC
POWER CORD ARE
AND
,
,
SIZE OF
,
CONNECTION TO
.
DCP0000072(D)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SkyEdge II-c Gemini and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Gilat SkyEdge II-c Gemini

  • Page 1 Have the CPE configuration parameters available • VSAT AC and DC power supplies are provided by Gilat. If the power to the VSAT is not through an AC or DC adaptor (e.g., batteries, solar panels, rectifier ETC), the power solution must be approved by the Gilat Technical Support.
  • Page 2 CPE Installation Note Place the CPE on an even, flat surface. Figure 1: Front View Connect the two RF cables (from the LNB and ODU) to the RF-IN and RF-OUT connectors, respectively, as shown in Figure 2, using a recommended torque of 13 lb*ft/in (1.5 N/m). Figure 2: Rear View Connecting AC adapter and power cords 1.

This manual is also suitable for:

Skyedge ii-c capricornSkyedge ii-c s2x

Table of Contents