Capricorn 4-Port Outdoor CPE Installation Guide
This installation guide is applicable to SkyEdge II-c Capricorn 4-Port Outdoor CPEs.
The P/N is determined by the power source as follows:
The measurements of this SkyEdge II-c Capricorn 4-Port Outdoor CPE model are
400x200x122 mm.
To install the SkyEdge II-c Capricorn Outdoor CPE, the installer must:
•
Be trained in the installation of the SkyEdge II-c Capricorn Outdoor CPE.
•
Have the CPE configuration parameters available.
Unpacking Guidelines
1. Unpack the Capricorn 4-Port Outdoor CPE unit and its accessories.
2. Compare with the supplied BOM and verify that nothing is missing.
3. Verify that nothing is damaged.
VSAT AC and DC power supplies are provided by Gilat. If the power to the VSAT
is not through an AC or DC adaptor (e.g., batteries, solar panels, rectifier ETC),
the power solution must be approved by the Gilat Technical Support.
Capricorn 4-Port Outdoor CPE General Information
B
EFORE INSTALLING THE UNIT
GROUNDED SO AS TO PROVIDE PROTECTION AGAINST VOLTAGE SURGES AND STATIC
CHARGES
S
ECTION
54
OF THE
PROPER GROUNDING OF THE MAST AND SUPPORTING STRUCTURE
-
LEAD
IN WIRE TO AN ANTENNA DISCHARGE UNIT
LOCATION OF ANTENNA DISCHARGE UNIT
REQUIREMENTS FOR THE GROUNDING ELECTRODE
The Capricorn Outdoor CPE contains 4 LAN ports and can use the DC input 24V/48V only {
Pin 1+, Pin 2-(RTN), Pin 4 Ground} (Figure 1). It is important to note that both the input and the
output to the BUC can be either 24v or 48v, depending on the model.
DCP0000169(D)
,
VERIFY THAT THE ANTENNA AND
.
810
US N
OF THE
ATIONAL
C
E
ANADIAN
LECTRICAL
Figure 1: Front Panel
Proprietary to Gilat Satellites Networks Ltd.
Warning
E
C
, ANSI/NFPA 70,
LECTRICAL
ODE
C
ODE PROVIDE INFORMATION WITH REGARD TO
,
SIZE OF GROUNDING CONDUCTORS
,
CONNECTION TO GROUNDING ELECTRODES AND
.
DC
POWER CORD ARE
S
AND
ECTION
,
GROUNDING OF THE
,
1
Need help?
Do you have a question about the SkyEdge II-c Capricorn and is the answer not in the manual?
Questions and answers