This installation note is applicable for SkyEdge II-c Capricorn Pro 4 DC series:
To install the SkyEdge II-c Capricorn Pro 4 CPE, the installer must:
Be trained in installing the SkyEdge II-c Capricorn Pro 4 CPE
Be familiar with the SkyEdge II-c CPE Installation Manual (DC-103322-X)
Have the CPE configuration parameters available
The SkyEdge II-c Capricorn Pro 4 CPE is designed to be installed on a shelf in a 19-inch rack, secured to the cabinet
by the rack mount ears.
The CPE can be installed with either front or rear panel facing forward. By default, the CPE is supplied with rack-
mount front ears secured to the front panel. The installation kit includes an additional pair of rack-mount back ears for
securing to the CPE rear panel to install the CPE with the rear panel facing forward.
The CPE may contain a built-in DC Inserter.

Unpacking Guidelines

1. Unpack the Capricorn Pro 4 CPE unit and its accessories.
2.
Compare with the supplied BOM and verify that all the items are supplied in good condition.
T
CPE
HE
CABLE TO THE GROUNDING STUD ON THE REAR OF THE
GROUND CONNECTION
T
CPE
HE
T
HE POWER CABLE MUST BE DISCONNECTED FROM THE

General Precautions

Do not block the ventilation openings of the CPE or place any object on top of the CPE.
Do not place the CPE in a location that would deviate from typical ambient environmental conditions of
temperature, humidity, and moisture.
B
EFORE INSTALLING THE UNIT
VOLTAGE SURGES AND STATIC CHARGES
S
810
ECTION
E
LECTRICAL
SUPPORTING STRUCTURE
GROUNDING CONDUCTORS
ELECTRODES AND REQUIREMENTS FOR THE GROUNDING ELECTRODE

Setting the SEII-c CAPRICORN PRO Output Voltage

1. Select the power according to the BUC you intend to use before connecting the power to the VSAT.
2. The VSAT's default output voltage setting is 24V. The output voltage test must be performed (step 4).
3. Using a flat screwdriver, set the right-side output voltage to
4. Turn on the VSAT and verify that the LED that signals the output voltage is the selected 24V or 48V
5. Turn off the VSAT and start the installation
P
LEASE NOTE THAT SETTING THE VOLTAGE TO A DIFFERENT SETTING WILL CAUSE CRITICAL
DAMAGE TO THE

Connecting the Grounding Cable

Connect the grounding cable (GND) from the CPE to the approved site.
1
Capricorn Pro 4 Installation Note
MUST BE GROUNDED PRIOR TO INSTALLATION BY ATTACHING ONE END OF THE GROUNDING
. 18AWG
GROUNDING CABLE SHOULD BE USED
MUST BE CONFIGURED PRIOR TO ATTACHING THE
,
VERIFY THAT THE ANTENNA IS GROUNDED TO PROVIDE PROTECTION AGAINST
US N
E
OF THE
ATIONAL
LECTRICAL
C
ODE PROVIDE INFORMATION WITH REGARD TO PROPER GROUNDING OF THE MAST AND
,
GROUNDING OF THE LEAD
,
LOCATION OF ANTENNA DISCHARGE UNIT
O
D
U
UT
OOR
NIT
C
AUTION
CPE,
RF
CPE
Warning
.
C
, ANSI/NFPA 70,
ODE
-
IN WIRE TO AN ANTENNA DISCHARGE UNIT
48
V, and the left side output voltage to
Warning
.
AND THE OTHER END TO THE SITE MAIN
.
.
CABLES
PRIOR TO CONNECTING THE
S
54
AND
ECTION
OF THE
,
CONNECTION TO GROUNDING
.
RF
.
CABLES
C
ANADIAN
,
SIZE OF
24
V.
DCP0000264(A)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SkyEdge II-c Capricorn Pro 4 DC Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Gilat SkyEdge II-c Capricorn Pro 4 DC Series

  • Page 1 Capricorn Pro 4 Installation Note This installation note is applicable for SkyEdge II-c Capricorn Pro 4 DC series: To install the SkyEdge II-c Capricorn Pro 4 CPE, the installer must: • Be trained in installing the SkyEdge II-c Capricorn Pro 4 CPE •...
  • Page 2 DISCONNECT ALL POWER CORDS BEFORE SERVICING THE UNIT The Capricorn CPE is powered with a 48VDC external power source. The CPE power connection uses the optionally supplied Gilat power cables (CB000912) that include a 7A fuse on the “+” wire. An accessible pole circuit breaker (Rated 10A) must be provided in the building for the DC power feed source In case of dual power supplies connect both inputs to the relevant power sources.

Table of Contents