Gilat SkyEdge II-c Capricorn PLUS Installation Notes

Advertisement

This installation note is applicable for SkyEdge II-c Capricorn PLUS CPE. The Capricorn PLUS CPE hardware
includes two parts to achieve high performance capabilities: the Modem (Capricorn Pro/MEC-based) and the Compute
Node that supports most of the Capricorn Pro/MEC data processing features.
To install the SkyEdge II-c Capricorn MEC CPE, the installer must:
Be trained in how to install the SkyEdge II-c Capricorn PLUS CPE
Be familiar with the SkyEdge II-c Capricorn PLUS VSAT Installation Manual DC-54TS005(A)
Have the CPE configuration parameters available
The SkyEdge II-c Capricorn PLUS CPE is meant to be installed in a 19-inch rack. The CPE should be inserted in the
rack and secured using rack-mount ears.
The CPE can be installed with either front or rear panel facing forward. By default, the CPE is supplied with rack-
mount front ears secured to the front panel. The installation kit includes an additional pair of rack-mount back ears for
securing to the CPE rear panel to install the CPE with the rear panel facing forward.

Unpacking Guidelines

1. Unpack the Capricorn PLUS CPE unit and its accessories.
Compare with the supplied BOM and verify that all the items are supplied in good condition.
2.
VSAT AC and DC power supplies are provided by Gilat. If the power to the VSAT is not
through an AC or DC adaptor (e.g., batteries, solar panels, rectifier ETC), the power solution
must be approved by the Gilat Technical Support.
• T
CPE
HE
TO THE GROUNDING STUD ON THE REAR OF THE
CONNECTION
• T
CPE
HE
T
HE POWER CABLE MUST BE DISCONNECTED FROM THE
General Precautions
Do not block the ventilation openings of the CPE or place any object on top of the CPE.
Do not place the CPE in a location that would deviate from typical ambient environmental conditions
of temperature, humidity, and moisture.
B
EFORE INSTALLING THE UNIT
AGAINST VOLTAGE SURGES AND STATIC CHARGES
S
810
ECTION
E
LECTRICAL
SUPPORTING STRUCTURE
GROUNDING CONDUCTORS
AND REQUIREMENTS FOR THE GROUNDING ELECTRODE

Setting Output Voltage

1. Select the power according to the BUC you intend to use before connecting the power to the VSAT.
2. The VSAT's default output voltage setting is 24V. The output voltage test must be performed (step 4).
3. Using a flat screwdriver, set the right-side output voltage to 48V, and the left side output voltage to 24V.
4. Turn on the VSAT and verify that the LED that signals the output voltage is the selected 24V or 48V
5. Turn off the VSAT and start the installation.
1
Capricorn PLUS Installation Note
MUST BE GROUNDED PRIOR TO INSTALLATION BY ATTACHING ONE END OF THE GROUNDING CABLE
. 18AWG
GROUNDING CABLE SHOULD BE USED
MUST BE CONFIGURED PRIOR TO ATTACHING THE
,
VERIFY THAT THE ANTENNA IS GROUNDED SO AS TO PROVIDE PROTECTION
US N
E
OF THE
ATIONAL
LECTRICAL
C
ODE PROVIDE INFORMATION WITH REGARD TO PROPER GROUNDING OF THE MAST AND
,
GROUNDING OF THE LEAD
,
LOCATION OF ANTENNA DISCHARGE UNIT
C
AUTION
CPE,
AND THE OTHER END TO THE SITE MAIN GROUND
.
RF
CABLES
CPE
PRIOR TO CONNECTING THE
Warning
.
C
, ANSI/NFPA 70,
ODE
AND
-
IN WIRE TO AN ANTENNA DISCHARGE UNIT
,
CONNECTION TO GROUNDING ELECTRODES
.
.
RF
CABLES
S
54
C
ECTION
OF THE
ANADIAN
,
SIZE OF
DCP0000273(B)
.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SkyEdge II-c Capricorn PLUS and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Gilat SkyEdge II-c Capricorn PLUS

  • Page 1 Have the CPE configuration parameters available • The SkyEdge II-c Capricorn PLUS CPE is meant to be installed in a 19-inch rack. The CPE should be inserted in the rack and secured using rack-mount ears. The CPE can be installed with either front or rear panel facing forward. By default, the CPE is supplied with rack- mount front ears secured to the front panel.
  • Page 2 CPE is powered with a 48VDC external power source. The CPE power connection PLUS uses the optionally supplied Gilat power cables (CB000912) that include a 7A fuse on the “+” wire. An accessible two pole circuit breaker (Rated 10A) must be provided in the building for the DC power feed source In case of dual power supplies connect both inputs to the relevant power sources.
  • Page 3 Capricorn PLUS Installation Note Attaching Rack Mount Back Ears To install the CPE with the rear panel facing forward: 1. Remove the screws holding the rack-mount front ears. 2. Remove the rack-mount front ears. 3. Secure the screws to the front panel. 4.
  • Page 4 Capricorn PLUS Installation Note 9. Repeat steps 7 until the output power is less than 0.3dB and higher than the output power in the previous measurement (i.e., the last test signal transmitted drove the BUC to near saturation). Record the attenuation value used for transmitting the last test signal.

Table of Contents