Tower Stand Installation
Step 1

2-4. Setup the UPS

Before installing the UPS,please read below to select proper location to install UPS.
1. UPS should be placed on the flat and clean surface. Place it in an area away from vibration,
dust, humidity, high temperature, flammable liquids, gases, corrosive and conductive con-
taminants. Install the UPS indoors in a clean environment, where it is away from window and
door. Maintain minimum clearance of 4" (100mm) in the bottom of the UPS to avoid dust and
high temperature.
2. It's required to maintain maximum altitude of 11,500ft to keep UPS normal operation at
full load UPS.
3. Place UPS: It's equipped with fan for cooling. Therefore, place the UPS in a well-ventilated
area. It's required to maintain minimum clearance of 4" (100mm) in the front of the UPS and
12" (300mm) in the back and two sides of the UPS for heat dissipation and easy-maintenance.
Step 1: UPS input connection
Plug the UPS into a two-pole, three-wire, grounded receptacle only. Avoid using extension cords.
• For 200/208/220/230/240VAC models: The power cord is supplied in the UPS package.
• For 100/110/115/120/125/127VAC models: The power cord is attached to the UPS. The input
plug is a NEMA 5-15P for 1.5K model, NEMA 5-20P for 2K model and NEMA L5-30P for 3K
model.
• To reduce the risk of fire, connect only to a circuit provided with (@) A maximum branch circuit
overcurrent protection in accordance with the National Electrical Code, ANSI/NFPA 70 and the
Canadian Electrical Code, Part I, C22.1".
Model
LD1500A/LD1500B
LD2000A/LD2000B
LD3000A/LD3000B
Note:
Check if the site wiring fault indicator lights up in LCD panel. It will be illuminated when the
UPS is plugged into an improperly wired utility power outlet (Refer to Troubleshooting section).
CPI User Manual for Lithium Ion Online UPS
Step 2
04/22v.1
Step 3
@
20A