ABB ACS580-01 +C135 Series Original Instructions Manual page 44

Hide thumbs Also See for ACS580-01 +C135 Series:
Table of Contents

Advertisement

44 Mechanical installation – Frames R4 and R5
3. Attach the chains to the lifting holes of the flange and lift the drive with a lifting
device onto the opening in the mounting plate.
4. Attach the bottom bracket with one screw.
5. Attach the top bracket with one screw.
6. Attach the rest of the mounting screws. Remove the chains.
(4.4 lbf·ft)
(4.4 lbf·ft)
(4.4 lbf·ft)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ach580-01 +c135 seriesAcq580-01 +c135 series

Table of Contents