ABB ACS580-01 +C135 Series Original Instructions Manual page 28

Hide thumbs Also See for ACS580-01 +C135 Series:
Table of Contents

Advertisement

28 Mechanical installation – Frames R1 to R3
2. Detach the power cable shelf (screws i). Reinstall the screws (1.5 N·m/1.1 lbf·ft)
to avoid moisture exchange through the empty holes! Attach the cable shelf
to the bottom bracket with M4 nuts. Frame R3 is shown as an example. The
cable shelf varies in different frame sizes.
(1.1 lbf·ft)
(1.1 lbf·ft)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ach580-01 +c135 seriesAcq580-01 +c135 series

Table of Contents