Trane P0V0 Series Installer's Manual page 8

Table of Contents

Advertisement

I I n n s s t t a a l l l l a a t t i i o o n n I I n n s s t t r r u u c c t t i i o o n n s s
8. O O p p e e r r a a t t i i o o n n a a l l a a n n d d C C h h e e c c k k o o u u t t P P r r o o c c e e d d u u r r e e s s
To obtain proper performance, all units must be
operated and charge adjustments made in
accordance with procedures found in the Service
Facts document of the outdoor unit. After
installation has been completed, it is recommended
that the entire system be checked against the
checkout list located at the back of this document.
See
"Checkout Procedures," p.
8
34.
9. M M a a i i n n t t e e n n a a n n c c e e
The system air filter(s) should be inspected, cleaned
or replaced at least monthly. Make certain that the
access panels are replaced and secured properly
before placing the unit back in operation. This
product is designed for dependable service;
however, periodic maintenance should be
scheduled and conducted by trained professional
service personnel. This service should be
conducted at least annually, and should include
testing and inspection of electrical components.
The blower motor is permanently lubricated for
normal operating conditions.
18-GE20D1-1E-EN

Advertisement

Table of Contents
loading

Table of Contents