Checkout Procedures

The final phase of the installation is the system Checkout Procedures. The following list represents the most common items covered in a
Checkout Procedure. Confirm all requirements in this document have been met.
☐ All wiring connections are tight and properly secured.
☐ Voltage and running current are within limits.
☐ Ductwork is sealed and insulated.
34
☐ Supply registers and return grilles are open, unobstructed, and air
filter is installed.
☐ Indoor blower and outdoor fan are operating smoothly and
without obstruction.
☐ Indoor blower motor set on correct speed setting to deliver
required CFM. "Blower and fan set screws are tight."
☐ Cover panels are in place and properly tightened.
☐ System functions safely and properly in all modes.
☐ Owner has been instructed on use of system and given manual.