Preventative Maintenance; Maintenance Actions After Each Shift - QuickLabel QL-800 Maintenance Manual

Hide thumbs Also See for QL-800:
Table of Contents

Advertisement

2
This chapter details maintenance that shall be performed on the QL-800 printer once per shift,
once per day, and once per week.

Maintenance Actions After Each Shift

The operator shall conduct basic maintenance after each shift (8 hours) of printer operation.
These regular cleanings will help keep the media motion smooth and unimpeded.
The following materials are required:
Unload media, remove the transport unit, and place the transport unit down on the work surface.
See Figure 1.
Figure 1: Preparing to clean the transport
QL-800 High Volume Maintenance Guide

Preventative Maintenance

A shift is defined as 8 hours of operation
A day is defined as 24 hours of operation
A week is defined as 168 hours of operation
Lint-free cloth
Caution: Always use lint-free cloth. Paper or other material can leave particles and debris
on the parts being cleaned. AstroNova recommends Bemcot M3 wipes. These are
available from AstroNova via part number 14806000.
Isopropyl alcohol (70%)
Protective gloves
5

Advertisement

Table of Contents
loading

Table of Contents