Setup via the ABL User Interface application
After you have set up all Extender charging stations and the external meter for the Controller, you must then de-
fine the parameters for the entire system. To do so, proceed as follows:
Make sure you are still logged into the ABL User In-
12
terface application in the Installer role.
y If not, change your role as described in step 4.
Switch to the Products > Installation tab, and, in
13
the Actions column, click the
troller charging station marked with C.
Set the Type to meter-controlled and save this
14
setting by clicking the corresponding tick 
Actions column.
Switch to the Products > Installation tab, and, in
15
the Actions column, click the
troller charging station marked with C.
Set the parameters for the controller.
16
y Maximum Value: Enter the maximum charging
current for the entire charging group here (for
example: 160 A).
y Fallback Value: Enter a static maximum current
for the charging group here if the controller does
not receive a measured value from the energy
meter within the specified Time Limit (for exam-
ple: 10 A) (see boxes on next page).
y Main terminal current limit: Enter the tripping
current for the building fuse here (for example:
180 A).
y Logical-Id of meter: Set the ID to the position
(Pos.) and the model name of the energy meter in
the Products > Installation table view here (for
example: 3/ExternalMeter).
y Metering type: Switch the measuring position
between total and section current measurement
here (see page 13).