9) Make sure that the heights are correct using the template hung on the wall and the
level.
E
N
G
10) After making sure that the measurements are correct and the structure is
completely levelled, drill the wall (4 holes in total) and insert screws, dowels and fixing
supports (F).
F
22 -
ENG
Need help?
Do you have a question about the Nobel Console and is the answer not in the manual?
Questions and answers