  • Page 1 INSTRUCTION MANUAL FLANGING MACHINE (COLD) F-400...
  • Page 2 Your local dealer is: Copyright © 2019 T-DRILL Oy. All rights reserved. This manual, or parts thereof, may not be reproduced in any form or by any means, nor translated into any other language without a written permission of T-DRILL Oy Is has been our aim to elaborate this instruction book with the greatest possible care and attention.
  • Page 3: Table Of Contents

    5.3 Connection of the machine to the sources of energy ...........18 5.3.1 Connection to the electric network ...............18 5.4 Start-up inspection .......................19 6. The operation of the flanging machine F-400 ...............20 6.1 Description of the control devices ................20 6.1.1 Main switch ......................20 6.1.2 Control panel ......................20...
  • Page 4 8.3 PLC-battery maintenance ....................63 9. Electrical equipment ....................64 9.1 Functioning ........................64 10. Appendix ........................65 10.1 Clamping Lengths (Standard clamps) ................65 10.2 F-400 Capabilities......................66 10.2.1 Carbon Steels .......................66 10.2.2 Austenitic Stainless Steels ..................66 10.2.3 Copper Alloys (copper, copper nickel, aluminium brass) ........67...
  • Page 5 F-400 FLANGING MACHINE 10.3 Approximate Operation Times of Flanging ..............68 10.3.1 Fixing of the Pipe into the Clamp ................68 10.3.2 Flanging (machine time) ..................68 10.4 Installation Times ......................69 10.5 Loose Flange Joint .......................70 10.5.1 Lapped Joint ......................70 10.5.2 Loose Flange ......................70 10.5.3.
  • Page 6: Notes On The Use Of This Instruction Manual

    1.1 GENERAL This instruction book contains the instructions for use, maintenance and setting of the T-DRILL machine, as well as recommendations regarding different working procedures and the use of the forming tools. Before proceeding with installation and operation of the machine, read the safety instructions in chapter 2 “General safety instructions”...
  • Page 7: Symbols And Warnings Used In The Machine

    F-400 FLANGING MACHINE 1.3 SYMBOLS AND WARNINGS USED IN THE MACHINE Read the instruction manual attentively before carrying out installation, operation, setting or maintenance of the machine. Electric box. Danger may be caused by electric installation. Sharp edges! Be extremely cautious when handling this area of the machine.
  • Page 8: Personal Protective Equipment For The Operator

    2. GENERAL SAFETY INSTRUCTIONS Read the instruction book attentively before carrying out installation, operation, setting or maintenance of the machine. The T-DRILL machine is to be used only for the purposes and in the way as specified in this manual.
  • Page 9: Flanging Machine Safety Instructions

    F-400 FLANGING MACHINE 2.1 FLANGING MACHINE SAFETY INSTRUCTIONS Before switching the flanging machine on, the work supervising personnel and the employees shall carefully acquaint themselves with the manual, the structure of the machine and it’s functioning. Memorize the location of each operating switch and the function the switch regulates.
  • Page 10: F-400 General Information

    INSTRUCTION MANUAL 3. F-400 GENERAL INFORMATION 3.1 INTRODUCTION OF FLANGING The machine is intended for widening the end of a pipe to form a flange using a rotating forming cone. The flange thus formed is used as a sealing and joining element in so- called loose flange joints.
  • Page 11: Methods Of Flanging

    F-400 FLANGING MACHINE on the conditions of use, EN1092-1 standard or standard derived from this can be used in dimensioning. The main factor, which defines the maximum diameter of the flange, is deforming capability of material. In practice this capability is expressed as elongation.
  • Page 12: Information On The Equipment

    INSTRUCTION MANUAL 3.4 INFORMATION ON THE EQUIPMENT Following equipment is available for F-400 machine: • Heating unit is equipment used for heating the pipe to be flanged or otherwise formed. The heating unit enables the flanging of thick-walled pipes. The equipment comprises an optional range of different heating nozzles, an infrared thermometer and an automatic flame guard.
  • Page 13: Technical Specifications

    F-400 FLANGING MACHINE 3.6 TECHNICAL SPECIFICATIONS Type Unit F-400 NOTE! Type code 4014 Pipe to be flanged (Ø33,7**) Ø42.4-Ø419 Maximum wall thickness See capacity diagrams Materials to be formed Copper, Carbon steels, RST, Other materials: Aluminium Consult T-DRILL Oy Flanging time See Machine time (13.3)
  • Page 14: Transport, Handling And Storage

    INSTRUCTION MANUAL 4. TRANSPORT, HANDLING AND STORAGE For transport the F-400 is packed into a wooden case and bolted to its bottom or is bolted to a wooden base and plastic covered. Weight of the machine is approximately 4500 kg.
  • Page 15: Installation

    F-400 FLANGING MACHINE 5. INSTALLATION 5.1 INSTALLATION AND LEVELLING OF THE MACHINE 5.1.1 LAYOUT 1. Gas valve*, 2. Oxygen valve*, 3. Electric connection, 4. Compressed air connection and regulator, 5. Machine outline measures. * Heating system is optional accessory!
  • Page 16: Space Requirement

    INSTRUCTION MANUAL 5.1.2 SPACE REQUIREMENT Leave enough space around the machine for operation and maintenance. Also take into account the space required for the pipe to be formed.
  • Page 17: Leveling

    - Required floor load capacity 3.0 t/m² - Floor level ± 5 mm /m² The F-400 machine must be leveled on its foundation before use. The leveling tolerance is 0,05mm on 1000mm. Use a spirit level. After leveling, fastening the machine to the foundation by means of anchor bolts is recommended.
  • Page 18: Ambient Conditions

    DANGER! Only a qualified and authorized person is allowed to carry out the connection of the F-400 machine to the mains. The terminals for connection of the external supply cable of the F-400 machine are located in the electric box. Pay special attention to the correct earthing of the machine.
  • Page 19: Start-Up Inspection

    F-400 FLANGING MACHINE 5.4 START-UP INSPECTION ¨NOTE! Carry out a start-up inspection before using the machine. A wrong direction of rotation or a wrong voltage may damage the machine. ¨NOTE! The start-up inspection is to be carried out only by a person authorized to perform this duty by the employer.
  • Page 20: The Operation Of The Flanging Machine F-400

    INSTRUCTION MANUAL 6. THE OPERATION OF THE FLANGING MACHINE F-400 6.1 DESCRIPTION OF THE CONTROL DEVICES 6.1.1 MAIN SWITCH The main switch of the machine is located on the door of the electric box on the backside of the machine. The power is connected by turning the main switch to the position “I”...
  • Page 21 F-400 FLANGING MACHINE Denomination Description of the function Selector of the forming Selects the forming of the pipe end (see separate table below) Selector of the way of Selects either cold or hot forming (see separate table forming below) Selector of the flanging mode Selects the way of flanging the pipe (see separate table...
  • Page 22 INSTRUCTION MANUAL Denomination Description of the function Cycle start push-button Starts the automatic cycle. Cycle starts only when the moving carriage is in start position. Push button also starts main burner gas flow during hot forming heating cycle. Cycle start lamp is on also when machine is driven to flame adjustment position.
  • Page 23 F-400 FLANGING MACHINE 1. FORMING MODE SELECT SWITCH Flanging. Small pipe flanging Expansion. This is used when expansion tool is used. Welding bevel of the pipe end (OPTIONAL) 2. FORMING TYPE SELECT SWITCH Cold forming. Hot forming. Flame adjustment. Heating system is optional accessory! 3.
  • Page 24: Key-Switch And Brake Release- Push Button

    When key switch is in position 1, the Brake release- push button (19) is not active. When key switch is in position 2, the Brake release- push button (19) is active. ¨Note! Never use the T-Drill machine USB socket to charge mobile phones or any other devices. The USB connection is only for program upload / download.
  • Page 25: Control Elements

    F-400 FLANGING MACHINE 6.1.6 CONTROL ELEMENTS...
  • Page 26 INSTRUCTION MANUAL Description of the elements No. Name Function Buffer plates These plates regulate the distance between the tool and the clamp when the frame is in front position. Thickness (N) of the plate chosen: - For cold flanging S < N < S + 2 S = wall thickness - For hot flanging S + 2 <...
  • Page 27 F-400 FLANGING MACHINE No. Name Function Frequency converter Pressure switches Pressure switches control automatic operation and in some (Behind service cover) cases limit the effect of the hydraulic cylinders. * Optional heating Pressure switches control automatic operation and in some system parts cases limit the effect of the hydraulic cylinders.
  • Page 28: The Valve Arrangement Board

    INSTRUCTION MANUAL No. Name Function Main pressure regulator Setting pressure 160 bar Help pressure- setting pressure 80 (behind service cover) bars. * Optional heating system parts Limit switch Clamp open limit switch (S38) Limit switch of safety Indicates that the safety cover is closed. Machine won’t cover start if the safety cover is open.
  • Page 29 F-400 FLANGING MACHINE Speed of clamping jaw movement: Closing movement: 9–10 mm/s Opening movement: 25–30 mm/s Speed of carriage movement: Backwards: 28–33 mm/s Forward: 15-20 mm/s Speeds of tool movements: Flanging movement: 15–19 s Return movement: normally 4 s The pressure regulation of the clamping jaws ¨NOTE! Only a person authorized by the employer is allowed to carry out...
  • Page 30: Stopping The Machine

    INSTRUCTION MANUAL 6.2 STOPPING THE MACHINE 6.2.1 THE NORMAL STOPPING OF THE F-400 MACHINE 1. Wait until the machine has finished the automatic work cycle 2. Stop the hydraulic motor by pressing the stop push-button . 3. Press the emergency stop push-button (red STOP button) completely down.
  • Page 31: Changing Of The Forming Pin

    F-400 FLANGING MACHINE 6.3.2 CHANGING OF THE FORMING PIN LDANGER! Before closing the clamping jaws make sure they can move freely - the jaws may crush your hands! 1. Start the machine by pushing the push-button 2. Close the clamping jaws by turning the clamp control switch to , in order to pressurize the hydraulics.
  • Page 32 INSTRUCTION MANUAL 11. Block the rotary movement of the forming pin by means of a 6mm allen key and loosen the 8mm hexagon socket screw, which is behind the pin. 12. If the forming pin does not easily come out of its housing, knock on the hexagon socket screw head with a hammer (the hexagon socket screw has not been removed completely, but is screwed sufficiently inside).
  • Page 33: Adjustment Of The Angle Of The Forming Pin

    F-400 FLANGING MACHINE 6.3.3 ADJUSTMENT OF THE ANGLE OF THE FORMING PIN The start and end positions of the forming pin are adjusted by changing the stopper of the forming device. There are 11 different stoppers available. The stopper affects to the angle of the flange.
  • Page 34: How To Correct Undesirable Flange Shape

    INSTRUCTION MANUAL 6.3.4 HOW TO CORRECT UNDESIRABLE FLANGE SHAPE Angle of the flange more than 90° If the desired angle of the flange is 90° and the result is more than 90°, the flange shape is corrected by increasing the thickness of the end position stoppers.
  • Page 35: Adjustment Of The Forming Pin Radius

    Bending radius adjustment scale Radius readings 1 - 7 are used with the small forming pin (F-200 forming pin) LNever use the radius readings 1 - 6 with large forming pin! (F-400 pin). The forming pin will crash into the clamp!
  • Page 36 INSTRUCTION MANUAL HOW TO ADJUST: 1. Fastening piece, 2. Locking screw M6, 3. Radius reading, 4. Forming pin tool, 5. Setting point 1. Loose the locking screws (4 pcs socket head screw M6) to release fastening pieces (1). Do not remove the screws and pieces. 2.
  • Page 37: The Fastening Of The Pipe

    F-400 FLANGING MACHINE 6.3.6 THE FASTENING OF THE PIPE In order to be able to fasten the pipe correctly for flanging, the following pipe dimensions are required: Fastening measures of the pipe Pipe O.D. N.S. Inch inch inch 42.4 1 1/4 4.92...
  • Page 38 INSTRUCTION MANUAL 1. Before switching the flanging machine on, the work supervising personnel and the employees shall carefully acquaint them with the manual, the structure of the machine and it’s functioning. Memorise the location of each operating switch and the function the switch regulates.
  • Page 39 F-400 FLANGING MACHINE Lift the pipe clamps into clamping jaws, use gloves to protect your hands. If you are using clamps bigger than Ø 219.1, you must use clamp lifting tool for easier changing (for normal clamps only), for instructions see separate manual for clamp lifting tool.
  • Page 40 INSTRUCTION MANUAL 13. Close the clamping jaw carefully (switch 13 ). Beware that the jaw does not cut in to the clamping tool or its fixing extensions. Fixing pins should be removed before that. Keep the fingers (hands) away from the moving jaws. Fixing pins removed.
  • Page 41: Setting The Length Of The Part Of The Pipe To Be Flanged

    6.3.7 SETTING THE LENGTH OF THE PART OF THE PIPE TO BE FLANGED F-400 flanging machine is equipped with potentiometer and display. (picture below). Display unit is located on the top of the control panel. With the display you can adjust length of the part of the pipe which is to be flanged, the rearmost and the front most position of the frame.
  • Page 42: Instructions For The Use Of The Display

    INSTRUCTION MANUAL 6.4 INSTRUCTIONS FOR THE USE OF THE DISPLAY Turn on the main power of the machine. The language selection screen appears. Language selection screen Select language. Now the menu- screen is shown. 6.4.1 MENU-SCREEN Menu- screen Description of the buttons: Move to: Move to: Move to:...
  • Page 43: User Level Selection - Screen

    F-400 FLANGING MACHINE 6.4.1.1 USER LEVEL SELECTION - SCREEN In this screen you can select the user level. These levels contain different rights for programming. Levels need a password except the basic level. You can insert the password by touching the password- field.
  • Page 44: Programming- Screen

    INSTRUCTION MANUAL In this screen you can check the values of the counters and reset the piece counter. Total piece counter cannot be reset. 6.4.1.2 PROGRAMMING- SCREEN You have to be logged in at least in level 1 to edit the programs. You can save 5000 programs.
  • Page 45: Pipe Setting- Screen

    F-400 FLANGING MACHINE 6.4.1.3 PIPE SETTING- SCREEN In this screen you select and edit the program you want to execute, but you cannot save it. Edit the values by touching the fields. ¨NOTE! The value of the “Back pos.” has to be 60mm larger than the value of the “Start pos.”.
  • Page 46: Input/Output- Screen

    INSTRUCTION MANUAL 6.4.1.4 INPUT/OUTPUT- SCREEN In this screen you can check the status of the inputs. When you touch the specific input, the name of the input is shown. Enter the Outputs screen with “Output” - button to check the status of the outputs the same way.
  • Page 47: Main Screen

    F-400 FLANGING MACHINE 6.4.1.6 MAIN SCREEN By pushing arrow - button in the Menu- screen you can move to Main- screen. The values shown on top of the Main- screen from left to right. 1. Model of the machine. 2. Type of the forming: Cold or Hot (Hot forming is option).
  • Page 48: Adjustment Of Forming Device

    INSTRUCTION MANUAL 6.5 ADJUSTMENT OF FORMING DEVICE LDANGER! Before closing the clamping jaws, make sure that they can move freely - the jaws might crush your hands! 1. Clamp the pipe. 2. Set the “Start Pos.” to zero (0.0mm) on the display (See previous chapter). 3.
  • Page 49 F-400 FLANGING MACHINE 5. Close the protective hood. Drive the carriage forward with switches 13 and 14 until the pin goes into the pipe. Press the power off. Open the hood. Adjust the slide so that the forming pin slightly touches the inner surface of the pipe. Or you can use the values of the setting value table according to the pipe size.
  • Page 50: Cold Flanging And Flaring Of The Pipe

    INSTRUCTION MANUAL In cold flanging one-, two- or three-phase flanging can be used. Multi-phase flanging is used especially with small pipe dimensions and thin-walled pipes. Selection of the multi- phase forming process can be done with a flanging mode select switch. Multi-phase flanging means that the forming cone does not accomplish the forming motion to the end but returns to the beginning once or twice.
  • Page 51: Working Instructions For Bevelling

    6.7 WORKING INSTRUCTIONS FOR BEVELLING The outer diameter of the tube to be bevelled can be between Ø42,4 and Ø325mm. ¨NOTE! The bevel can be produced only, if the F-400 machine has been ordered with this optional accessory. 6.7.1 THE INSTALLATION OF THE BEVELLING TOOL 1 Remove the forming pin (see chapter “Changing of the forming pin”, points 1-12)
  • Page 52: The Adjustment Of The Forming Tool

    INSTRUCTION MANUAL 6.7.2 THE ADJUSTMENT OF THE FORMING TOOL LDANGER! Before closing the clamping jaws, make sure that they can move freely - the jaws might crush your hands! 1. Fasten the tube into the clamp 2. Turn the bevelling blade into starting position by turning the switch 13 and turning at the same time the control switch 15 of the tool into the position 3.
  • Page 53: The Work Cycle Of The Bevelling Operation

    F-400 FLANGING MACHINE 6.7.3 THE WORK CYCLE OF THE BEVELLING OPERATION 1. Install the bevelling tool. 2. Fasten the tube into the clamp 3. Regulate the creeping speed of the forward movement of the carriage by closing the valve, and then open the valve by 1/5 of a turn.
  • Page 54: Adjustment And Operation Of Flanging Machine Based On Setting Value Table

    INSTRUCTION MANUAL 6.8 ADJUSTMENT AND OPERATION OF FLANGING MACHINE BASED ON SETTING VALUE TABLE Set the select switches corresponding to the pipe to be flanged. 1. Remove the previously used pipe clamp and change the pipe clamps to match the pipe to be flanged.
  • Page 55: Changing Of The Forming Slide

    F-400 FLANGING MACHINE 7. CHANGING OF THE FORMING SLIDE Flanging slide changing instruction 1. Drive the moving carriage backwards until slide is close to the top cover line. 2. Turn the flanging pin to start position. 3. Press the emergency stop and open the hood.
  • Page 56 INSTRUCTION MANUAL ¨NOTE! Do not enter the rotating area of the slide. The slide may rotate due to eccentric mass. 10. Lift the slide upwards by rotating the adjustment screw counter clockwise. Simultaneously keep the crane lifting so that the lifting chain does not get loose. However, do not try to lift slide with crane until adjustment screw gets loose.
  • Page 57: Maintenance

    F-400 FLANGING MACHINE 8. MAINTENANCE Maintenance points, F-400 cold flanging machine See following pages for details.
  • Page 58: Lubrication

    INSTRUCTION MANUAL 8.1 LUBRICATION DAILY LUBRICATION MAINTENANCE: 1. Bearings of the flanging pin and or expanding pin. - Grease nipple behind swinging frame - Lubricant: DIN 51825 KP 2K or NLGI 2, EP-grease, lithium complex, 40°C 190cSt, 20…+120°C. E.g. Shell Gadus S2 V220 2 or equivalent. 2.
  • Page 59 F-400 FLANGING MACHINE 10. Hydraulic System Daily checks: Oil level, oil temperature, filter condition indicator, replacement of filter inserts when necessary, checking components and pipework for leaks and repairing when necessary, operating noise, visual inspection of hoses (abrasions, cracking, etc.), surface temperatures of actuators and components using a surface thermometer (max.
  • Page 60 INSTRUCTION MANUAL 6. The slide - Lubricate with a brush. - Lubricant: NLGI 1,5 , EP-grease, lithium complex, viscosity 40°C 550cSt, -20°…+150°C. E.g. Gadus S3 V550L 1 or equivalent 7. Chain transmission - Lubricate with oil can, lubricant: chain oil...
  • Page 61 F-400 FLANGING MACHINE MONTHLY MAINTENANCE: 8. Moving carriage and slide cylinder rod ends - Lubricant: DIN 51825 KP 2K or NLGI 2, EP-grease, lithium complex, 40°C 190cSt, -20… +120°C. E.g. Shell Gadus S2 V220 2 or equivalent. 9. Speed of the clamping jaw closing movement Check the speed adjustment monthly, or at least after the hydraulic system maintenance.
  • Page 62: Regular Weekly Inspection

    INSTRUCTION MANUAL 8.2 REGULAR WEEKLY INSPECTION 8.2.1 INSPECTIONS OF SPINDLE CHAIN TIGHTNESS The tightness of the chain should be adjusted so that the sag is 7...12 mm, i.e. when the centre point of the free part of the chain is made to swing, the length of the movement is approx.
  • Page 63: Plc-Battery Maintenance

    F-400 FLANGING MACHINE 8.3 PLC-BATTERY MAINTENANCE Nominal voltage of the battery is 3V (battery type: FX3U-32BL). Battery of the PLC should be changed after 4-5 years of use. 1. Turn of the power. 2. Remove the battery cover: Slightly lift the “B” side of the battery cover (“A”). Grasp the cover (“A”) between your fingers and remove it.
  • Page 64: Electrical Equipment

    INSTRUCTION MANUAL 9. ELECTRICAL EQUIPMENT 9.1 FUNCTIONING 1. Power is supplied through the connection box located in the back of the machine. In the connection box there is the main switch Q1 and the transformer for control supply. 2. Protection against short-circuiting is provided by means of the fuses and the protecting elements in the connection box.
  • Page 65: Appendix

    F-400 FLANGING MACHINE 10. APPENDIX 10.1 CLAMPING LENGTHS (STANDARD CLAMPS) Pipe O.D. N.S. Inch inch inch 42.4 1 1/4 4.92 10.24 48.3 1 1/2 4.92 10.24 60.3 4.92 10.24 73.0 2 1/2 4.92 10.24 88.9 4.92 10.24 114.3 4.92 10.24 139.7...
  • Page 66: F-400 Capabilities

    INSTRUCTION MANUAL 10.2 F-400 CAPABILITIES 10.2.1 CARBON STEELS Flanging by cold forming: Pipe dimensions to be flanged 10.2.2 AUSTENITIC STAINLESS STEELS Flanging by corld or warm forming: Pipe dimensions to be flanged...
  • Page 67: Copper Alloys (Copper, Copper Nickel, Aluminium Brass)

    F-400 FLANGING MACHINE 10.2.3 COPPER ALLOYS (COPPER, COPPER NICKEL, ALUMINIUM BRASS) Flanging by cold forming: Pipe dimensions to be flanged...
  • Page 68: Approximate Operation Times Of Flanging

    INSTRUCTION MANUAL 10.3 APPROXIMATE OPERATION TIMES OF FLANGING (By installed equipment) 10.3.1 FIXING OF THE PIPE INTO THE CLAMP 10.3.2 FLANGING (MACHINE TIME) A: One-turn flanging (generally if S > 3..4 mm, F.I. carbon steel Ø114.3 * 4 Cold forming) B: Multiturn flanging (generally by thin materials, F.I.
  • Page 69: Installation Times

    F-400 FLANGING MACHINE 10.4 INSTALLATION TIMES Operation time 0,7...5,6 min/flange Installation time 3...1 min/dimension...
  • Page 70: Loose Flange Joint

    INSTRUCTION MANUAL 10.5 LOOSE FLANGE JOINT Dimension Chart for Nominal Pressure 10 bar when using standard forming pin (3401288) 10.5.1 LAPPED JOINT Outside diameter Wall thickness D4 max. EN1092-1or BS 4504 or corresponding D4 min OD + 30 x √ 0.02 x OD EN1092-1 or BS 4504 or corresponding 10.5.2 LOOSE FLANGE EN1092-1 or BS 4504 (DIN 2576)
  • Page 71 F-400 FLANGING MACHINE Min flange diameter d4 Wall thickness on the flanged pipe end The wall-thickness of the flanged pipe end: O.D. = Outside diameter of the pipe = the original wall-thickness of the pipe r = the inner radius of the bent area...
  • Page 72: Troubleshooting

    INSTRUCTION MANUAL 11. TROUBLESHOOTING When some kind of problem appears first check the alarm- screen on the display (see chapter 6.2.5). You might find the reason to the problem there. Problem Cause Remedy Power does not go The hood is open The hood is open The carriage is not in the start Drive the carriage to the start...
  • Page 73 Check the flanging pin setting. from the pipe I.D. If the problem is not solved with the help of trouble shooting instructions, contact your local T-DRILL dealer. Give your contact information : • The name of the company • Your own name and position •...
  • Page 74: Ordering Spare Parts

    By proceeding this way you will prevent misunderstandings and you make sure to receive the correct spare parts and a prompt service. Contact information: Global USA, Mexico, Canada Spare part inquiries and orders sales@t-drill.fi sales@t-drill.com Technical support service@t-drill.fi service@t-drill.com Fax:...
  • Page 75 More T-DRILL products for tube fabrication SEC-100 TBC Automatic Tube Collaring System for multiple collars with 2-axis positioning up to 114.3 mm collars. PLUS-500 TEC-150 HD Powerful and competitive collaring system for large pipe/vessel collaring Heavy Duty Collaring Station by one operator for most malleable materials.