Summary of Contents for ACF Greenhouses GROW MORE GM13D
Page 1
Assembly Instructions MODEL: GM13D GREENHOUSE SIZE: 13' 3 7/8"L x 13' 3 7/8"W x 8' 11 1/2"H 406cm L x 406cm W x 273cm H EXTENSION SIZE: 6' 6 3/4"L x 13' 3 7/8"W x 8' 11 1/2"H 200cm L x 406cm W x 273cm H PLEASE READ INSTRUCTIONS CAREFULLY BEFORE ASSEMBLY Packing List Item No.
Page 2
CONTENTS 1. Assembly Advice ..............Page 1 2. Product Features ..............Page 1 - 2 3. Parts List ................Page 3 - 6 4. Base Assembly ..............Page 7 - 10 5. Door Assembly ..............Page 11 - 13 6. Roof Vent Assembly ............Page 14 7.
Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that this product is assembled by at least two people. 2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly. 3.
Page 4
5. A steel base is not required as the aluminium base frame is fixed to the necessary concrete footings with the expansion bolts provided, alternatively you can easily secure it to a timber base with timber screws(not provided). Expansion screw / Concrete ground 6.
Page 7
PART QTY. PART QTY. PART QTY. L02A L02B L04B L05B M6X12 L05C L05D M6X20 L08B Ø4X16D L15A Ø5X30 Ø4X8 L04E M8X60 L03A L03B L03K L08A L05E L05F...
Page 8
PC Box No. 1 Door Assembly Front Wall Assembly Back Wall Assembly PART PART PART QTY. QTY. QTY. PC Box No.1 PC Box No. 2 2 Sections Assembly PART QTY. PC Box No.2...
Page 9
10mm Expansion screw/Concrete ground It is essential the dimensions a + b are the same to ensure the base is square. Steel pegs in soil Support at the corners only is inadequate.
Page 11
GM13D + Ext(1) Rear Assembly Front Assembly 2 Section 2 Section 2 Section Assembly Assembly Assembly Middle Middle Section Section GM13D 2M EXT. * The basic model,GM13D,can be easily extended by adding a '2 Section Assembly' each time for a longer size.
Page 12
1000 1000 1000 1000 1000 Front Rear 2 Section-1 GM13D Ext(1) * This shows a layout for W05's positions where it is placed in the middle of PC panel for each section.
Page 17
PART QTY. L08A L08B L08B L08B L08A L08B L08A J01R/L L08B L08A L08B L08A L08B L08A&L08B J01R/L L08A L08B L08A L08B J01R/L L08A&L08B L08B L08A L08B J01R/L L08A L08B L08B J01R/L Assemble all D07 followed by previous Page 15 after each base profile is connected.
Page 18
L04C L04A L04C L01D L04A L03F L03E L01E L03F L03E L01D 3*S05 L01E PART QTY. L01E L03E L04A L03F L04A Slide 3*S05 into L04A,and L03F&E L04C tighten L04A at each end with S05 M6X12 L04A...
Page 19
PART QTY. L04B M6X12 L04B L04B L04B 2*S05 L03E&F L04B 2*S05 L04B L01D&E Slide 2*S05 into L04B,and tighten L04B at each end with S05 Slide 2*S05 into L04B,and tighten L04B at each end with S05...
Page 20
Note: please insert upper roof supports but, PART QTY. L01B do not lock in place until you have aligned the L01C poly-carbonate inserts. L01B L01C L05A L05A M6X12 L05A make sure you pay close attention to the direction of the pins L01B L01C L01D...
Page 21
Slide 3*S05 into L04A,and PART QTY. tighten L04A at each end L01D with S05 L01E L04C L03E L04A L03F L04A L04C L04A L04C L01D M6X12 L03E L03F L01E L03F L03E L01D L03F&E 3*S05 L01E L04A L04A...
Page 22
QTY. PART L04B L04B L04B M6X12 L03E&F L04B L04B 2*S05 2*S05 L04B L01D&E Slide 2*S05 into L04B,and Slide 2*S05 into L04B,and tighten L04B at each end tighten L04B at each end with S05 with S05...
Page 23
Note: please insert upper roof supports but, PART QTY. do not lock in place until you have aligned L01B the polycarbonate inserts. L01C L01B L01C L05A L05A M6X12 L05A make sure you pay close attention to the direction of the pins L01B L01C L01B...
Page 24
PART QTY. L02A L03A M6X12 L02A L02A L03A L02A L03A Slide 3*S05 into L02A,and L02A tighten L02A at each end with S05 L03A 3*S05 L02A L03A L03A...
Page 29
L04B L04E L04B L04B L04E L04E L04B L04E L04E Pay attention to the cut edge of L04E which should be fixed, facing up. S05x6pcs L04B QTY. PART L04B L04B L04E S05x2pcs L04E M6X12 Pay attention to the cut edge of L04B which should be fixed, facing down.
Page 32
QTY. PART J06R/L Ø5X30 Ø4X16D Use L09 to cover the edges of all Y9 after all roof PC panels are fixed in place, then tighten them with Z10. J06R/L Drill one hole on both L01A & L01D & L01E approx 500mm up from the bottom, Dia.
Page 33
To install the doors, simply slide the hinge pins on the doors into the corresponding hinge sleeves on the greenhouse. The latch shown in image 1 joins the two sections of the doors together. To make minor height adjustments you can remove or add the spacers provided on the pin section of the hinge.
Page 34
QTY. PART L05D L05D L05D L05D M6X12 L05D Once the L09 is in place. A small bead of silicon suitable for polycarbonate can assist in preventing leaks. L05D...