Any benches, shelving, plastic trays, pots and baskets should also be cleaned thoroughly. Prevention is the best known method for controlling pests and diseases in the greenhouse. NOTE: DO NOT STORE POLYCARBONATE SHEETS IN THE SUN. – 2 – ACF Greenhouses...
7). When bolting the horizontal cross brace onto the back wall, measure the back wall so that it does not sag (See Detail #4, Page 7). Back Gable-End Line Drawing Assembly Procedure Curved Poly End Bars Poly Bars Cross Brace 1" x 2" Angle Base – 6 – ACF Greenhouses...
NOTE: You may want to fasten a temporary brace across the bottom of the door frame to keep them together. This can be a piece of wood, make sure that the opening is the same as on the top of the door frame. – 8 – ACF Greenhouses...
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Front Gable-End (with door) Line Drawing Assembly Procedure Door Frame Top Plates Door Frame Sides Plate 1" x 2" Angle Poly Bar Poly Bar Curved Poly End Bar Diagonal Angle Brace – 9 – ACF Greenhouses...
NOTES: Taping can also be done either before (as shown in pictures to the right) or after the greenhouse is assembled. Do NOT put foam tape along the End Bars. The polycarbonate slides under the lip and needs to be sealed when the greenhouse is finished – 11 – ACF Greenhouses...
Slide in the bolt, lift up the end, and push it into the side base/sill as far as you can. Then bolt it on. Do this for all the Poly Bars with sliders and numbers. The end of the bar should be tight to the base. (See Step 5 Detail, page 16) – 12 – ACF Greenhouses...
NOTE: Sealing can also be done after greenhouse is finished and before the vents are installed. 11. SIDE VENTS, INTAKE SHUTTER AND EXHAUST FANS INSTALLATION (IF NECESSARY) SEE APPENDIXES B THRU E. THEN RETURN TO THE NEXT PAGE AND CONTINUE – 13 – ACF Greenhouses...
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Assembly Outline Step 1: Side Sill & Base Step 3: Step 2: Back Front Gable-End Gable-End – 14 – ACF Greenhouses...
Page 16
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Step 4: Ridge Inside View Inside View Outside View Outside View – 15 – ACF Greenhouses...
Page 17
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Step 5: Poly Bar with Vent Frame Sliders – 16 – ACF Greenhouses...
Page 18
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Step 6: Vent Frame Bottom Inside View – 17 – ACF Greenhouses...
Page 19
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Step 7: Install All Remaining Poly Bars – 18 – ACF Greenhouses...
Page 20
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Step 8: Roof Purlin 3" Purlin on larger greenhouses 3" Purlin 3" Purlin – 19 – ACF Greenhouses...
Then your assistant can take over. Do this with all the sheets. (If it is windy while installing the panels, you may need to finish off each panel as you move along.) (See page 23.) (See page 21 for pictures.) – 20 – ACF Greenhouses...
“ ” does not slide into the door frame track). Also, make sure that the second track (in the door frame) is used; otherwise, the panel will sit on an angle (page 22, picture ). Finish off the door end. – 22 – ACF Greenhouses...
“ ” under the above door Outside View angle. CAULKING • Seal the door frame bar where the base/sill meets the door frame. • Seal the inside of the base/sill along the perimeter of the foundation. Roof – 23 – ACF Greenhouses...
Run a bead of silicone under the angle above the door and against the door frame. Also silicone the “ ” on the polycarbonate beside the door to ensure an airtight seal. Z Bar Z Bar – 24 – ACF Greenhouses...
Door Installation Z-Bar #10 x 1/2" Door Screws Z-Bar Vertical Jamb Plan View INSIDE GREENHOUSE Base Base Base Plate @ Base Vertical Jamb Door OUTSIDE GREENHOUSE Z-Bar ACF Greenhouses...
Take the vent and slide it in the end of the ridge. You will have to remove a rectangular screw in the ridge. Then push it into place and put the screw back in. Now attach manual opener (picture A). – 26 – ACF Greenhouses...
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S – 27 – ACF Greenhouses...
Page 29
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Greenhouse Roof Vent Details – 28 – ACF Greenhouses...
If the hole does not line up, you may have to drill a new hole in the truss bracket . Do this after all the glass bars have been bolted together. To fasten the truss to the foundation, use 1/4" x 2" leg bolts. – 29 – ACF Greenhouses...
1/2” through the swivel block. Vent Bottom Rail T Bracket Power Tube Vent Gutter Closing Spring Sill T Bracket Vent Frame Bottom Angle Piston Rod Swivel Block Threaded Adjuster – 31 – ACF Greenhouses...
Louvre Motor Louvre Motor 26" Rip Flush 2" x 1" x 1/8" Aluminum Angle Vertical Glazing / Poly Bar " 1/4" x 1/2" S.S. Bolt Louvre Motor Inside Outside View Vertical Glazing / Poly Bar – 32 – ACF Greenhouses...
Appendix D – Exhaust Fans INTAKE SHUTTER ASSEMBLY Inside Motor Fan Motor Cage 2" x 1" x 1/8" Aluminum Angle Vertical Vertical Glazing /Poly Bar Glazing / 1/4" x 1/2" S.S. Bolt " Poly Bar Inside Fan Cage – 33 – ACF Greenhouses...
3. Bolt on 1 x 2 angle sill in place making sure sliders are above sill. 4. Bolt top header in place on top of side sliders. 5. Slide vent into place. 1/4" x 1/2" S.S. Bolt 6. Install automatic or manual opener. – 34 – ACF Greenhouses...
Page 36
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Appendix E – Side Vent CONTINUED – 35 – ACF Greenhouses...
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S Appendix F – Glass Louvre GLASS OR POLYCARBONATE GLASS LOUVRE ASSEMBLY – 36 – ACF Greenhouses...
Page 38
C R O S S C O U N T R Y S E R I E S C U R V E D L E A N T O M O D E L • G R E E N H O U S E I N S T R U C T I O N S At this point, stand back and enjoy your workmanship. Your Cross Country Curved Lean To Greenhouse should now be closed in and ready for use. Congratulations! ACF Greenhouses...
Need help?
Do you have a question about the Cross Country Series and is the answer not in the manual?
Questions and answers