Download Print this page

ACF Greenhouses SOLAR HARVEST Greenhouses SH7 Assembly Instructions Manual

Hide thumbs Also See for SOLAR HARVEST Greenhouses SH7:

Advertisement

Quick Links

MODEL: SH7
GREENHOUSE SIZE: 6' 10 3/4"L x 6' 10 3/4" x 6' 10 3/4"H
EXTENSION SIZE: 4' 6 1/8"L x 6' 10 3/4"W x 6' 10 3/4"H
PLEASE READ INSTRUCTIONS CAREFULLY BEFORE ASSEMBLY
Item No.
Model No.
2534100
SH7
2534110
SH7 ext
Assembly Instructions
210cm L x 210cm W x 210cm H
137.5cm L x 210cm W x 210cm H
AL No.1
1CTN
Packing List
AL No.2
1CTN
Customer Support
Support@ACFgreenhouses.com
1-888-888-9050
PC No.1
PC No.2
1CTN
1CTN

Advertisement

loading
Need help?

Need help?

Do you have a question about the SOLAR HARVEST Greenhouses SH7 and is the answer not in the manual?

Questions and answers

Summary of Contents for ACF Greenhouses SOLAR HARVEST Greenhouses SH7

  • Page 1 Assembly Instructions MODEL: SH7 GREENHOUSE SIZE: 6' 10 3/4"L x 6' 10 3/4" x 6' 10 3/4"H 210cm L x 210cm W x 210cm H EXTENSION SIZE: 4' 6 1/8"L x 6' 10 3/4"W x 6' 10 3/4"H 137.5cm L x 210cm W x 210cm H PLEASE READ INSTRUCTIONS CAREFULLY BEFORE ASSEMBLY Packing List Item No.
  • Page 2 CONTENTS 1. Assembly Advice ..............Page 1 2. Product Features ..............Page 1 - 2 3. Parts List ................Page 3 - 5 4. Base Assembly ..............Page 6 - 8 5. Door Assembly ..............Page 9 - 10 6. Roof Vent Assembly ............Page 11 7.
  • Page 3: Functions And Features

    Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that this product is assembled by at least two people. 2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly. 3.
  • Page 4 4. The greenhouse can be easily extended at any stage in 1.4m long sections as detailed in the table of Front Page. 5. Base anchor brackets are included as standard with expanding bolts to ensure a secure fixing into concrete or paving. Alternatively, you can use the brackets to fix into a timber base with wood screws (not provided).
  • Page 5: Front Wall

    (ALU. Box No.1) Door Assembly 3 Sections Parts PART PART PART L02A L18A L02B L02B L18B L06A L16A L07A L16B L08A L16C L09A L05C L05G L05D Front Wall L15A PART L01A L01B M6X10 L01C L04B L01D M8X60 L03E Ø4X14D L03F Ø5X15 L04B Ø4X8...
  • Page 6 (PC No.1) PC No.1...
  • Page 7 EXT. 2 Sections(AU.Box No.2) 2 Section Part PART PART L02A L02B L02B L04B L05C L05D L08D M6X10 L10A L10B M8X60 L10C Ø4X16D L15A Ø5X15 Ø4X8 EXT. 2 Sections (PC No.2) PC N0.2...
  • Page 8 Expansion bolt in concrete It is essential the dimensions a + b are the same to ensure the base is square. Steel bar/Lawn land...
  • Page 9 Back Front Assembly * This shows a layout for W05's positions where it is placed in the middle of PC panel for each section.
  • Page 10 Back Assembly Front Assemby 3 Section Assemby Dim/Model etc. SH7 + EXT(1) SH7 + EXT(2) SH7 + EXT(3) SH7 + EXT(4) SH7 + EXT(5) (mm) 2092.2 2092.2 2092.2 2092.2 2092.2 2092.2 (mm) 2092.2 3463.8 4835.4 6207 7578.6 8950.2 (mm) 2958.8 4046.6 5268.6 6550.1...
  • Page 11 Door1 Assembly PART QTY. L18A L18B L16A L16B L16C L18A L05G L16B L05G Ø4X14D M6X10 L18B L16B L18A L16B L18A L18B L18B...
  • Page 12 Door2 Assembly L18B L18A L16A L05G L16C L18B L18B L16A L18A L16A L18A L16C L16C...
  • Page 13 PART QTY. Roof Vent Assembly L15A L15A M6X16 Ø4X16D Ø4X10...
  • Page 14 L08A L08A L08A L08A J03R/L L08A L08A L08A L08A J03R/L make sure you pay close attention to the direction of the pins J03R/L L08A L08A L08A L08A J03R/L must connect all plastic parts (J03 R/L) before completing this step...
  • Page 15 L03C L03D L01A L01A L01A L03C L08A L08A L08A L03D L01A L08A L08A L08A...
  • Page 16 L03C L01A L04B L04B L04B L04B L04B L04B L03D L01A L04B L04B L04B...
  • Page 17 Note: please insert upper roof supports but, do not lock in place until you have aligned the poly-carbonate inserts. L01B L01C L05A L05A L01C L01B L01B L01B L01C L01A L01A make sure L03C you pay close attention to the direction of the pins L05A L05A...
  • Page 18 L03F L03E L01D L01A L01D L03E L08A L08A L08A L03F L01A L08A L08A L08A...
  • Page 19 比例 L04B L04B L04A L04A L04B L04B L04B...
  • Page 20 L06A L01C L01B L07A L05A L05A L01C L01B Note: please insert upper roof supports but, do not lock in place until you have aligned the poly-carbonate inserts. L07A L06A L01C L05A L05A L03E...
  • Page 21 L06A L02B L07A L05D L02A L05C L02B L06A L05C L05D L08C...
  • Page 23 Roof Vent Assembly L04B L15A S01*4PCS Z03 Z03 L04B JXX8001 L04B L04B S01/M01...
  • Page 25 J02R/L J07R/L L09A Use L09A to cover the edges of all Y9 after all roof PC panels are fixed in place, then tighten them with Z03.

This manual is also suitable for:

Solar harvest greenhouses sh7 ext25341002534110