6. Getting Connected Guide

Bandwidth Requirements

Minimum bandwidth required for SMARTconnect

Power Requirements

• SMARTconnect Insignia Units: These run on battery power (4 D batteries) and do not require power from the
facility.
• SMARTsync: This will require facility power via the relevant cord (see table), purchased by customer.
Life Fitness Part Number
1019820-0001
1019820-0002
1019820-0003
1019820-0004
• WASPs: These will be powered over Ethernet (PoE) via PoE cables running from WASP to network switch.
is 10 Mbps. This does not vary based on numbers of units installed.
Description
LINE-CORD: 18AWG, IEC320 C5, 6FT/1.8M, USA PLUG NEMA 5-15P
LINE-CORD: 18AWG, IEC320 C5, 6FT/1.8M, EU PLUG CEE 7/7
LINE-CORD: 18AWG, IEC320 C5, 6FT/1.8M, UK PLUG BS-1363
LINE-CORD: 18AWG, IEC320 C5, 6FT/1.8M, AU PLUG AS 3112
Page 13 of 55