CMD 23 Series Installation Manual

Slab boxes

Advertisement

Quick Links

23 series
(slab boxes)

1 compartment slab box

3 compartment slab box

Slab box fixing methods

Screw fixing with retractable fixing brackets
Swivel the retractable
Mark and drill the fixing
fixing brackets out on
positions in the desired
the base of the slab box.
location.

Adhesive fixing (optional)

Clean the location for
Apply a suitable
the slab box ensuring
adhesive fixing method
the area is free from
to the base of the slab
dust and debris.
box.
Installing accessory plates
Remove the required
Position plates in desired
knockouts and attach a
orientation and fix in
suitable conduit. Feed
place with 2x taptite
wires into the box.
screws.
Part No: 134251 Issue No: 001

2 compartment slab box

4 compartment slab box

Screw the slab box to
the floor substrate with
2x suitable screws at the
points shown.
Position the box in the
desired location and
follow steps provided by
adhesive manufacturer.
(if applicable)
The box is ready to
connect to power.
Installation, user and care guide

Earthing the box and sockets

Standard Earth
The box base must be earthed with a suitable ring terminal to the integrated
earth stud. To ensure the sockets are earthed, a link will be required from
the box earth stud to the socket earth. On Clean Earth (C/E) Low Noise
installations these should be wired directly to the Clean Earth CPC (Circuit
Protective Conductor).

Tap-off engagement/release

**WARNING**
An unterminated tap-off MUST NEVER be connected to a live track.
Provided that it is off load, a terminated tap-off may be removed/
inserted into a live track. Conduit must be bonded to Earth.
'CLICK'
Align tap-off pins with
Press down and push
slots on socket. Push
backwards until button
down to engage.
clicks upwards to lock.
Testing and resetting SRCD socket
Active SRCD state
Indicator
up
A qualified or fully
When active, the SRCD
competent person
indicator window is
should test the SRCD
filled with a red marker.
before first use.
'CLICK'
To reset after it has
The indicator will change
tripped, press and hold
to show it is now active.
the grey reset button
Remove your finger from
until a click is heard.
the reset button.
Clean Earth (C/E) Low Noise
To remove, press button
to disengage. Push
forwards and lift up to
remove.
(if applicable)
Tripped SRCD state
Test
Reset
Indicator
down
When the SRCD trips,
the red marker in the
indicator window
recedes as shown.
A qualified person
should test the SRCD
function periodically to
comply with standards.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 23 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for CMD 23 Series

  • Page 1 23 series (slab boxes) Installation, user and care guide 1 compartment slab box 2 compartment slab box Earthing the box and sockets Standard Earth Clean Earth (C/E) Low Noise The box base must be earthed with a suitable ring terminal to the integrated earth stud.
  • Page 2 If viewing this sheet prior to specification/technical documentation purposes, be aware of potential plug clashes with certain socket plate orientations. Product care • Clean using a dry cloth. No abrasives or solvents to be used on the product. • Do not drop or expose to moisture. CMD Ltd, Rotherham, S65 1EN, UK T: 01709 829 511 E: enquiries@cmd-ltd.com...

This manual is also suitable for:

134251

Table of Contents