3. Installation and configuration

3.1. AC wiring

3.1.1. Configuration options

The configuration option of either Grid Meter, PV Inverter, Generator or AC Meter is set in the GX device. That selection will effect
how the system should be wired, and how the information received from the meter is displayed on the screen.
See below diagrams for the different wiring options:
When used to measure a PV Inverter, terminals 1, 2 and 3 should face the PV inverter to ensure correct
direction of current and power.
On the GX device go to the grid meter in the Wired AC sensor settings. Make sure 'Phase type' is set to 'Single phase' and 'PV
inverter on phase 2' is enabled.

3.1.2. System examples

Example diagram
In this diagram, a single ET340 is used to both measure the grid and a single phase PV Inverter.
Page 4
Energy Meter Manual
ET340
3-phase wiring
L3
L2
L1
N
PE
PE
N
L3
L2
L1
Installation and configuration