Sr. no.
Description
1
General
2
Safety
2.1
Symbols used in these operating instructions
2.2
Personnel qualification and training
2.3
Non-compliance with safety instructions
2.4
Safety awareness
2.5
Safety instructions for the operator / user
2.6
Safety instructions for maintenance,
inspection and installation work
2.7
Unauthorised modification and manufacture
of spare parts
2.8
Unauthorised modes of operation
3
Transport and interim storage
4
Description
4.1
General description
4.2
Configuration and function
4.2.1
Configuration
4.2.2
Function
4.3
Dry running protection (supplementary
equipment)
4.4
Manual mode
4.5
Control cabinet
4.6
Flow diagram
5
Installation at site
5.1
Readiness for operation
5.2
Installation and location
5.3
Piping
5.4
Foundation
5.5
Location
5.6
Installing a pressure reducer
5.7
Location and installation of unpressurised
inlet tanks
5.7.1
Location
5.7.2
Installation
5.8
Valves and fittings
5.9
Noise characteristics
6
Connection to power supply
6.1
Electric wiring
6.2
Power supply cable
6.2.1
Sizing the power supply cable
6.3
Protective measures
6.4
Temperature requirements
6.5
Humidity requirements
6.6
Installation altitude
6.7
Pollution exposure
6.8
Checking the voltage
6.9
Logic / circuit diagrams
6.10
Over load relay
6.11
Potential equalization
Contents
Page no.
Sr. no.
Description
1
7
Commissioning / start-up
7.1
Preparations for commissioning / start-up
1
7.2
Test run
1
7.3
Checking the direction of rotation
1
7.4
Functional description / Automatic mode
1
7.5
Starting the unit
1
7.5.1
Function of the control panel
1
7.5.1.1
Function / Navigation keys
7.5.1.2
Display
1
7.5.1.3
Parameter Screen
7.5.2
Menu structure
2
7.5.3
Access Level
2
7.6
Displaying and changing parameters
2
7.7
Monitoring
7.8
Parameter list
2
7.9
Warning and alerts - overview
2
7.10
Adjusting the settings
2
7.10.1
Setting the set pressure
2
7.10.2
Further settings
2
7.10.2.1
Parameter 3-2-2-37 Bandwidth
7.10.2.2
Parameter 3-2-2-17 No-flow detection time
3
7.10.2.3
Parameter 3-2-2-33 / 3-2-2-34
3
7.10.2.4
Parameter 3-2-2-40 save fact to user
3
7.11
Remote-OFF connection (optional)
4
7.12
Shutdown
5
8
Dismantling / reassembling the pumps
5
5
9
Returning to service
5
10
Maintenance
5
10.1
Operation monitoring
5
5
11
Work on the control cabinet
12
Inspection
5
13
Check list
5
5
14
Pre-charge pressure
5
15
Electrical performance data
5
16
Shutoff head
6
6
17
Trouble-shooting
6
Acceptance report
6
6
Check list for commissioning / start-up
6
Annexure I - Environment Protection -
6
Product Disposal after useful life
6
6
6
6
6
6
moviBOOST VPt / CL
Page no.
6
6
6
7
7
7
7
8
8
8
8
8
9
9
10
14
14
14
14
14
14
14
14
14
14
15
15
15
15
15
15
15
16
16
18
19
20
21
22
Need help?
Do you have a question about the moviBOOST VPt and is the answer not in the manual?
Questions and answers