Page 1
INSTALLATION, OPERATION AND MAINTENANCE MANUAL Figures 991-D and 991-U Drawing EAV-7080, 3” to 20” Wastewater Vacuum Breaking Valves TABLE OF CONTENTS Introduction ….………………………… 1 Description of Operation ..………… 1 Receiving & Storage ..……………… 1 Installation ..…………………………. 1 Valve Construction ..………………. 1 Start-Up ...……………………………….
Page 2
Refer to the List of Materials submitted for the order if INSTALLATION non-standard materials were provided. Figure Numbers suffixed with “D” (e.g., 991-D) indicate the valve has an ANSI Class 125 flanged Refer to Page 4 for details of construction and parts pipeline connection, Figure Numbers suffixed with “U”...
Page 3
START-UP It is not necessary to disassemble the entire valve to The valve generally does not require any calibration replace the shaft packing, follow steps 1 to 3 and 5a. or adjustment prior to start-up. The counterweight(s) should be initially placed at the far end of the arm and Ensure there is no pressure within the valve secured by tightening the set screw (31A).
Page 4
REPLACEMENT PARTS WARRANTY: Genuine replacement parts are available from your The Warranty for GA Industries valves is local VAG/GA Industries representative or from the included in our Terms and Conditions which can factory: be found here: https://gaindustries.com/terms...
Page 5
Part No. Part Name Std. Material Part No. Part Name Std. Material Body Cast Iron Gland Cast Iron Body Seat Bronze or SS Gland Stud & Nut Steel Seat O-Ring Buna-N Packing Teflon Seat Pins Stainless Steel Shaft Lock Pin Brass Disc with Center Pin Cast Iron/Steel...
Need help?
Do you have a question about the 991-D and is the answer not in the manual?
Questions and answers