4.8 INSTALLATION CHECK LIST
1. Ensure Power Supply is secured properly within the KSU using supplied spring
washers and screws.
2. Ensure that a separately cabled and fused 240VAC G.P.O. is provided for the
system.
3. Ensure that the separately cabled and fused 240VAC G.P.O. is connected to the
Protective Earth.
4. Ensure the system is initialised correctly and operating in the correct country
mode.
5. Install the modular line sockets and line cord as supplied with the keystations.
6. Install a digital Key station in programming port 100 (port 000) and assign to a
low priority user.
7. It is recommended that any new cabling installed is CAT5 UTP.
8. Ensure KSU is not installed in the vicinity of equipment emitting high levels of
EMI. Eg. Photocopying equipment, Radio Transmission equipment, Electrical
switching equipment. etc.
9. Ensure KSU is installed in a location that is free from excessive dust, vibration,
flooding, and flammable materials.
10. Ensure the KSU is mounted in a well ventilated area having a temperature range of
0-50 degrees C with a humidity range of 10-95% non-condensing.
11. The installer must ensure that the supplied installation tails, line cords and
modular blocks are used.
12. The integrity of the P.E. must be tested and verified by an electrician.
13. A separate Telecom Reference Conductor must not be connected.
14. Use only AUSTEL approved products as specified in the technical manual. Eg.
MOH LIU, LSA etc.
15. The KSU must be installed in an upright position in the horizontal plane, not
under a ceiling/floor, on its side, etc. This is governed by the mounting slots on
the KSU.
In the event of the system requiring an Expansion KSU, the two KSU‟s must
16.
be bonded together using the supplied clamps and cables.
Aria Communications Pty Ltd.
A.C.N. 090 723 925
4-44
Installation
Rev 1.3