Clock Control Cable Wiring - LG Aria-34e Installation Manual

Table of Contents

Advertisement

Aria-34e
Digital Key Telephone System
MBU connector CN15
(for slot #4~7)
SLOT #N - CO1-T
SLOT #N - CO1-R
SLOT #N - CO2-T
SLOT #N - CO2-R
SLOT #N - CO3-T
SLOT #N - CO3-R
SLOT #N - CO4-T
SLOT #N - CO4-R
Table 7. DIRECT MAPPING TABLE FOR TLIB
When using connection to the ISDN network, an RJ45 type connector on the ISDN
interface cards (2BRI, PRI, STIB) and not the CHAMP connector on the MBU is
used. See Figure 33.

4.7.6 Clock Control Cable Wiring

When two or more Digital CO/ISDN interface boards (2BRI, PRI or STIB) are
installed in the system, the clock control cable should be installed for system
synchronisation with the ISDN network. The connection method is shown in Figure
34.
Basically the system uses the clock output from the board that is installed in slot #3 as
a master clock.
Aria Communications Pty Ltd.
A.C.N. 090 723 925
Direct mapping
to TIE line
VT - 1
VR - 1
E-1
M-1
VT - 2
VR - 2
E-2
M-2
Figure 33. ISDN LINE WIRING
4-39
Installation
Remark
Port 1
Port 2
Rev 1.3

Advertisement

Table of Contents
loading

Table of Contents