Napoleon NZ26 Installation And Operation Instructions Manual page 11

Solid fuel burning-zero clearance
Table of Contents

Advertisement

TOP FIREBRICK AND BAFFLE
INSTALLATION:
The fireplace is shipped with the firebricks in place. Top
firebricks, fibre baffles and gasket rope are not installed.
TOP FIREBRICK
TUBE
1
Unscrew and remove the front tube retainer. Note that
1
the first tube retainer also holds the side brick in place.
Slide the tube either to the left or right and remove. Remove
the two middle tubes in the same fashion.
1
R E A R
BRICKS
GASKET ROPE LOCATION
2
Place gasket rope along the upper ledge of the air
2
chamber and on the top of the rear bricks. The top
and bottom flame spreaders come taped together. This
tape will burn away in the initial firing of the unit. On subse-
quent brick removals, the bottom flame spreader must be
taped to the top spreader to ease top brick and baffle
removal and to avoid damaging the fibre baffles.
TOP FLAME SPREADER
BOTTOM FLAME SPREADER
FIBRE BAFFLE (1 OF 2 SHOWN)
3a
WARNING: Operation of the fireplace without the top
firebricks and the baffles can result in excessive tem-
peratures that could damage the fireplace, chimney
and the surrounding enclosure.
FIBRE BAFFLE
TUBE
RETAINER
FIGURE 20
FIGURE 21
TOP FIREBRICK (1 OF 2 SHOWN)
FIGURE 22
BAFFLE SUPPORT BRACKET
3b
Insert the left baffle, then the left top firebrick. Repeat
3
using the right baffle and brick.
The baffles are made of a brittle material. Care must be
taken not to bend or force them.
Replace the three front tubes. Position the center edges of
both baffles and bricks until they lie snugly together.
Slide the baffle support bracket into place along the front of
the unit between the front tube and the two top firebricks.
4
11
FIGURE 23
W415-0156 / A / 04.09.03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents