Installation Instructions; Accessories - OCEANAIRE OWC1811QC Engineering, Installation And Service Manual

1.5 ton deluxe portable water-cooled spot cooler with quick connect
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS

RECEIVING—INSPECTION
Upon receiving your unit, inspect the packaging for any damage. All units are shipped
on a skid, and packaged in a triple-wall carton for added protection.
BEFORE INSTALLING
Check the unit for any damage. All Oceanaire products are thoroughly inspected at the
factory and carefully packaged. If any damage is evident, contact Oceanaire
IMMEDIATELY.
ELECTRICAL REQUIREMENTS
Check the nameplate located on the back of the unit to confirm the proper power is
available for the unit. Refer to "Specifications" section for voltage and amperage
requirements. For the proper NEMA receptacle, refer to "Electrical service plug
configuration". When using an extension cord, use the proper gauge cord, and check
cord voltage at the unit.
TIME DELAY FUSES/CIRCUIT BREAKERS ARE RECOMMENDED
WARNING—OPERATING THE UNIT ON IMPROPER VOLTAGE
WILL VOID THE WARRANTY
A DAMAGED LCDI POWER SUPPLY CORD MUST BE REPLACED
WITH A NEW POWER SUPPLY CORD OBTAINED FROM
OCEANAIRE, AND NOT REPAIRED
CAUTION
AN EXTENSION CORD CAN BE USED PROVIDED IT IS RATED AT LEAST 15 AMPS
@ 115 VOLTS WITH GROUNDING-TYPE ATTACHMENT PLUG AND GROUNDING
TYPE CONNECTOR (LOAD FITTING)

ACCESSORIES

Verify that all accessories are correct for the model, and are installed in accordance
with all instructions.
START-UP
Install the unit in accordance with all local and state building codes, and install all
accessories. Allow for a clearance around the unit for future maintenance and/or ser-
vice. Level unit and lock casters. Connect power and test the LCDI on the power cord.
Power up unit via thermostat, and check for proper operation. Refer to Thermostat
Operation for more details.
6

Advertisement

Table of Contents
loading

Table of Contents