Preparing The 5105-22E, 9008-22L, 9009-22A, Or 9223-22H System For Operation After Removing And Replacing An Nvme M.2 Carrier Card And Flash Module - IBM Power System 5105-22E Manual

Nvme m.2 carrier cards and flash modules
Hide thumbs Also See for Power System 5105-22E:
Table of Contents

Advertisement

Figure 24. Replacing the air baffle
Preparing the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system for
operation after removing and replacing an NVMe M.2 carrier card and flash
module
To prepare the system for operation after removing and replacing an NVMe M.2 carrier card and flash
module, complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Slide the service access cover (A) onto the system unit.
3. Close the release latch (B) by pushing it in the direction shown.
30 Power Systems: NVMe M.2 carrier cards and flash modules