11
Clip the ground wire to the bottom of the heater and
to the square hole on the back cover.
12
Install tape to the front edge of the heater.
13
For the drawer model only, remove the center
mounting trim and insall the new trim provided with
this kit.
14
Insert both units into the opening.
15
Secure side trim using the clips and screws provided.
If using a power drill, set to the lowest torque setting
to avoid stripping the inside of the clips.
16
Align the center trim with the clips, and press to
install.
Designer Series - Undercounter and Drawers Dual
Page 2 of 4
Installation
subzero.com
800.222.7820
Need help?
Do you have a question about the Designer Series and is the answer not in the manual?
Questions and answers