Checks Before Powering Up The Control Unit; Putting The Equipment Into Operation - IBCcontrol MicroMax180 Manual

Control unit for rotary heat exchanger
Table of Contents

Advertisement

CHECKS BEFORE POWERING UP THE CONTROL UNIT

Check that
Check that
Check that
Check that

PUTTING THE EQUIPMENT INTO OPERATION

Should be done in sequence.
Check that
Adjustment of
maximum rpm
Checking
minimum rpm
Checking the
cleaning function
Checking the
rotation monitor
Finish by
the control unit is connected as per instructions on page 10.
Connection voltage 230-240 V +/-15%, 50/60 Hz.
the motor is wired for 3x230 V. If there is an operating switch between the
motor and the control unit, the motor thermal contact should be
connected via the auxiliary terminal in the operating switch.
the input signal is 0-10
V.
the cleaning function and rotation monitor DIP switch are set to ON.
the motor rotates in the right direction in relation to the rotor's direction
of rotation.
In the event of a fault, switch two phases to the motor.
Set the "High Speed" DIP switch to the ON position.
Adjust "Max. rpm" so that the rotor rotates at 10-12 rpm
(or as per directions from rotor manufacturer).
After a test run, set the DIP switch to OFF.
Set the "Low Speed" DIP switch to ON.
Check that the rotor starts.
The minimum rpm is preset.
After a test run, set the DIP switch to OFF.
Switch off the voltage.
Make sure the "Cleaning function" DIP switch is set to ON and the input
signal is disconnected.
When power is switched on, the rotor will rotate at minimum rpm for
10 seconds.
The yellow "Rotation" LED will flash when the magnet passes
the magnetic sensor, regardless of DIP switch position.
having the control unit drive the rotor at maximum and minimum
rpm and checking that the rotor speed is correct.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

F21018301

Table of Contents