Download Print this page

ClearSpan 104903 Assembly Instructions Manual

Premium solar star greenhouse

Advertisement

Quick Links

Premium Solar Star™ Greenhouse
©2006 ClearSpan™
All rights reserved. Reproduction without permission is prohibited.
Revision date: March 2006g
Assembly Instructions
SKU# 104903

Advertisement

loading
Need help?

Need help?

Do you have a question about the 104903 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ClearSpan 104903

  • Page 1 Premium Solar Star™ Greenhouse Assembly Instructions SKU# 104903 ©2006 ClearSpan™ All rights reserved. Reproduction without permission is prohibited. Revision date: March 2006g...
  • Page 2 Consult a professional contractor to determine the best must seek the help of a qualified contractor. and safest way to anchor the greenhouse. Visit www.ClearSpan.com for additional products and customer assistance. 1 of 18...
  • Page 3: Assembly Procedure

    Adjustable pliers and self-locking pliers • Ladders and/or work platforms • Adjustable Clamps to clamp panels together during installation. Additional tools and supports may be needed depending on the structure, location, and application. Visit www.ClearSpan.com for additional products and customer assistance. 2 of 18...
  • Page 4 Metal Frame Recycled Plastic Base A-Angle (104642) to secure steel Neo-Bonded washers Roof Support Plates frame to recycled plastic base and Tek Screws (if recycled plastic base is used). Visit www.ClearSpan.com for additional products and customer assistance. 3 of 18...
  • Page 5 NOTE: Do not seat or secure the plain pipe tightly to the Non-Door) Side Board swaged pipe at this time. The separate pipes must be allowed to adjust outward during assembly to allow proper panel fit. Visit www.ClearSpan.com for additional products and customer assistance. 4 of 18...
  • Page 6 NOTE: All 3" x 3" square plates are attached to the greenhouse on the inside using self-tapping 3/4" Tek screws. See the photo that follows. Visit www.ClearSpan.com for additional products and customer assistance. 5 of 18...
  • Page 7 7. Using the above diagram, position a pass-through corner bracket. connector on the frame tube in the locations identified by the arrows. See diagrams on the next page. Visit www.ClearSpan.com for additional products and customer assistance. 6 of 18...
  • Page 8 ATTENTION: Lock the deadbolt of the door before you slide the base rails together. Photo shows the upper triangular panel as installed. Visit www.ClearSpan.com for additional products and customer assistance. 7 of 18...
  • Page 9 ATTENTION: Use a tie-down strap and ratchet (not View is from the top looking down on the frame. included) to keep the center of the base in place. See Visit www.ClearSpan.com for additional products and customer assistance. 8 of 18...
  • Page 10 28. Complete the installation of the lower roof support in the diagrams on the next page. plates by installing another 26" section. Repeat for the door end panels. Visit www.ClearSpan.com for additional products and customer assistance. 9 of 18...
  • Page 11 They do not rest on top of the end panels. See diagram NOTE: Diagram shows the union of the two roof panels in the next column. at the peak of the greenhouse. Visit www.ClearSpan.com for additional products and customer assistance. 10 of 18...
  • Page 12 ATTENTION: Each ridge cap section is longer than the width of each roof panel and will extend beyond the roof panel seams to overlap with the next section of ridge cap. Visit www.ClearSpan.com for additional products and customer assistance. 11 of 18...
  • Page 13 43. Move to the back of the greenhouse and install a non-vented (short) roof panel. 44. Attach another section of ridge cap to the peak in the location shown in the next diagram using Tek screws and neo-bonded washers. Visit www.ClearSpan.com for additional products and customer assistance. 12 of 18...
  • Page 14 Refer to Step 39 if needed. Visit www.ClearSpan.com for additional products and customer assistance. 13 of 18...
  • Page 15 56. After installing the vent openers, read the Foil Tape and Silicone Sealant information and attach the greenhouse flashing as described. WARNING: FLASHING IS SHARP! WEAR GLOVES WHEN HANDLING AND INSTALLING ALL FLASHING. Visit www.ClearSpan.com for additional products and customer assistance. 14 of 18...
  • Page 16 3. After attaching the first section, install the next White dashed line shows the edge of the flashing under section and overlap the first section by a few inches. the polycarbonate of the roof panel. Visit www.ClearSpan.com for additional products and customer assistance. 15 of 18...
  • Page 17 Ground Anchoring System 5. Read the MUST READ document and the anchoring information for the greenhouse. ATTENTION: After anchoring the greenhouse, read the Care and Maintenance information that follows. Visit www.ClearSpan.com for additional products and customer assistance. 16 of 18...
  • Page 18 • If the shelter is moved, inspect all parts and connections before reassembling. • Depending on the contents, construction of the shelter, shelter materials, and shelter location, the potential for condensation exists. ClearSpan™ offers several items that can be used to help resolve a condensation condition. Please contact a ClearSpan™ representative for additional information.
  • Page 19 Angled End polycarbonate Panel Side Panel Photo shows the flashing as installed correctly behind (or under) the polycarbonate of the side panel and for all roof panels. Visit www.ClearSpan.com for additional products and customer assistance. 18 of 18...