MC 700.4 TEST PROCEDURES 1. INSTRUMENTS 1). Power source 2). VOM meter 3). VP-7724A audio precision 4). Oscillograph 5). Two load resistors with 4O(1000W) 6). AC protector TEST PROCEDURES Set all the dip switches to the position OFF and VR of CH1/CH2 (or CH3/CH4) to MAX. When the power switch is turned on, the blue power indicator lights up.
MECHANICAL PART LIST PART NO DESCRIPTION SPECIFICATION LEVEL MA05624 ZC-front panel-5076 dark blue MC700.4 ALTO_V1.0 MI03067 padding board 2*13*422 MG00025 black plated screw- pan head M3*6 MA05625 ZC-front panel-silver paint MC700.4 ALTO_V1.0 HI00022 power SW-RS 4P black R13-69A HK05929 K-PCB...
Page 49
ZB-fixed rack for front panel-silver paint MISTRAL6000 right _V1.0 MG00295 black plated screw-pan head M4*6 MI02399 ZB-fixed rack for front panel-silver paint MISTRAL6000 left _V1.0 MC00779 ZC-top cover -silver paint MC700.4 ALTO_V1.0 NI01867 self adhered pad 20.5*14*7.6mm(SF-006) HK05930 K-PCB P-MC700SP MG00020...