Beko QWIK-PURE 200 Instruction Manual page 14

Table of Contents

Advertisement

Installation • Instalación
Installation • Instalação
14
english
Please check the relevant legal regula-
tions in your country. You should also
contact the public authorities in your area,
since there may be regional variations.
1. Area of installation
• Sealed floor or spill basin!
QWIK-PURE
200 = 42 gallons
®
QWIK-PURE
350 = 62 gallons
®
It is crucial to ensure that untreated con-
densate or oil cannot get into the sewer
system in the event of damage.
• The floor area must be stable and level
(max. inclination 1°) to ensure reliable
functioning of the QWIK-PURE
2. Inflow
Up to 4 feed points can be connected
directly to the QWIK-PURE
®
If there are more than 4 feed points, it will
be necessary to lay a collecting line.
• Ring system along the wall:
- nominal diameter 1" (DN 25)
- above QWIK-PURE
inlet (height above
®
floor)
- slight slope down to the QWIK-PURE
unit (min. 3°)
• Feed in the condensate from the top
into collecting line (swan-neck pipe
bend)
QWIK-PURE
.
®
.
®
200, 350
®

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qwik-pure 350

Table of Contents