AL-KO EASYAIR flat GF-01 Operating And Assembly Instruction Manual page 43

Flat air handling unit
Table of Contents

Advertisement

Assembly
Valves and actuators must be installed professionally. Please note here whether a version with a 2-way or 3-way
valve is to be implemented.
For the electrical connection of the actuator, see the circuit diagram.
2-way valve and 3-way valve versions
Fig. 30 2-way valve and 3-way valve connection versions
1
PCW cooler
2
Valve actuator
Counterflow principle for heat exchanger connection
Fig. 31 Counterflow principle for heat exchanger connection
6
Air inlet
7
Air outlet
3059570
Counter-hold using a suitable tool (e.g. pipe wrench) during connection of the heat exchang-
ers in order to avoid damage.
Install pipes and connections in such a way that the heat exchangers remain freely accessible
for maintenance.
Maximum working pressure: 16 bar
Maximum hot water flow temperature: 120 °C
2-way valve
5
6
9
7
8
Subject to changes in line with technical progress.
ATTENTION
3-way valve
3
Valve
4
Recirculation pump (on-site)
8
9
7
6
7
8
9
8
6
6
7
9
8
Media inlet
9
Media outlet
5
43

Advertisement

Table of Contents
loading

Table of Contents