AL-KO EASYAIR flat GF-01 Operating And Assembly Instruction Manual page 39

Flat air handling unit
Table of Contents

Advertisement

Assembly
Valves and actuators must be installed professionally. Please note here whether a 2-way or 3-way valve version is
to be set up.
For the electrical connection of the actuator, see the circuit diagram.
Requirements for water
free of corroding properties
free of oxygen
free of carbon dioxide
2-way valve and 3-way valve versions
Fig. 26 2-way valve and 3-way valve connection versions
1
PWW heater
2
Frost monitor
3
Valve actuator
Counterflow principle for heat exchanger connection
Fig. 27 Counterflow principle for heat exchanger connection
6
Air inlet
7
Air outlet
Step
Action
1
Connect the heat exchanger using the counterflow principle (water flow direction opposite the air flow direction in the
unit).
2
Connect the pre flow up or down depending on the air direction.
3
Carefully vent the heat exchanger.
4
Check all of the piping for leaks.
3059570
Maximum working pressure
2-way valve
1
2
5
4
3
5
6
9
7
8
Subject to changes in line with technical progress.
Maximum hot water flow temperature
16 bar
3-way valve
1
3
4
4
Valve
5
Recirculation pump (on-site)
8
9
7
6
7
8
9
8
6
6
7
9
8
Media inlet
9
Media outlet
120 °C
2
5
5
39