5) Ensure that "WWtensor –U9 –p/dev/serX 9000BL" has been entered below the top three lines.
The "#" must be removed from the beginning and the serial port number must be changed to
the correct serial port for communication
a. In this line, "X" is representative of which ever serial port number the Baseline unit is
connected to.
6) Press ctrl+x to exit.
7) Press "y" to save
8) Press enter to return from the programs file
9) Enter "WWsetup"
10) Go to Well Management
Page 29 of 36
Figure 40: Programs File
SLS Baseline 9000 FID Total Gas Detector Manual