Mitsubishi Electric MSZ-GL06NA Service Manual page 52

Hide thumbs Also See for MSZ-GL06NA:
Table of Contents

Advertisement

OPERATING PROCEDURE
7. Removing the water cut, the indoor fan motor, the
indoor coil thermistor, and the line flow fan
(1) Remove the panel (Refer to section 1.) and the right
corner box.
(2) Remove the power monitor receiver holder, the electrical
box and the nozzle assembly. (Refer to section 2 - 4.)
(3) Remove the screw of the water cut and remove the
water cut.
(4) Remove the screws fixing the motor bed.
(5) Loosen the screw fixing the line flow fan.
(6) Remove the motor bed together with fan motor and
motor band.
(7) Remove the screw of the motor band.
(8) Release the hooks of the motor band. Remove the
motor band. Pull out the indoor fan motor.
(9) Remove the indoor coil thermistor from the heat
exchanger.
* Install the indoor coil thermistor in its former position
when assembling it.
(10) Remove the screws fixing the left side of the heat
exchanger.
(11) Lift the heat exchanger, and pull out the line flow fan to
the lower-left.
* When attaching the line flow fan, screw the line flow fan
so 13/64 inch (5 mm) gap is provided between the right
end of the line flow fan and the right wall of the air pas-
sage of the box (Figure 1).
Figure 1
13/64 inch
(5 mm)
Photo 7
Screw of the
water cut
OBH732D
Electrical box
Screw of the
electrical cover
Screw of the
V.A. clamp
Power monitor
receiver holder
PHOTOS/FIGURES
Photo 8
Screw of the line flow fan
Photo 9
Screw of the
motor band
Photo 10
Screws of the
heat exchanger
52
Motor band
Screws of the
motor bed

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents